A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Park, B.-S.

Paper Title Page
MOPD050 Operation of the PEFP 20MeV Proton Linac at KAERI 798
 
  • H.-J. Kwon, E.-M. An, Y.-S. Cho, I.-S. Hong, J.-H. Jang, D.I. Kim, H.S. Kim, K. Min, B.-S. Park, K.T. Seol, Y.-G. Song, S.P. Yun
    KAERI, Daejon
 
 

The 20MeV proton accelerator has been operating since 2007 when it got an operational license at Korea Atomic Energy Research Institute (KAERI) by Proton Engineering Frontier Project (PEFP). Beam property such as an emittnace was measured at the low energy beam transport (LEBT) to characterize the beam into the RFQ. In addition, several parts were modified to test the adaptability of those which would be used for the 100MeV linac. The modulator for the 100MeV linac was installed and tested in the 20MeV linac test bench. In addition, low level RF (LLRF) system was modified in the overall configuration and the operator interface (OPI) with EPICS. In this paper, the beam property measurement results and modification of the linac are presented.

 
THPEA031 Development of a 13.56MHz RF Implanter at PEFP 3747
 
  • T.A. Trinh, Y.-S. Cho, I.-S. Hong, J.-H. Jang, H.S. Kim, H.-J. Kwon, H.R. Lee, B.-S. Park
    KAERI, Daejon
 
 

In the RF linac, the RF system is roughly half of the total cost. The 13.56MHz rf generator is cheap and readily available. Therefore, an rf implanter which uses a cavity operating at the frequency of 13.56MHz has now been considered and developed at Proton Engineering Frontier Project (PEFP) - Korea. The implanter consists of a Duoplasmatron ion source, a triplet focusing magnet, an rf cavity, a bending magnet and an end chamber. It can accelerate particles up to 32keV/u for charge to mass ratio of 1/4. The implanter design concept, fabrication, testing and commissioning are presented in this presentation.