Paper | Title | Page |
---|---|---|
WEOBRA01 | Benchmarking of the NTRM Method on Octupolar Nonlinear Components at the CERN-SPS Synchrotron | 2435 |
|
||
The measurement of synchrotron nonlinear components is an essential step for devising an effective compensation scheme for improving machine performances. A validation test of a recently proposed method called nonlinear tune response matrix (NTRM) for measuring circular accelerator nonlinear components is undergoing in a CERN-GSI joint effort. The test consists in the attempt of reconstructing few controlled octupolar components in the SPS synchrotron. In this proceeding we report on the SPS benchmarking experiment and discuss the performances the NTRM method applied to this measurements. |
||
|
||
THPEB003 | Determination of the Acceptance of SIS-18 using an RF Voltage | 3879 |
|
||
The present heavy ion synchrotron SIS-18 will be upgraded to be used as a booster for further synchrotrons being part of the FAIR project underway at GSI. We present a technique to measure the acceptance of an accelerator based on the extension of a previous method by the measurement of particle loss which we have applied to SIS-18. Here, we used an RF voltage to transversally excite a coasting heavy ion beam. The resulting transverse growth of the beam leads to particle loss when the beam width exceeds the limiting aperture. The acceptance has been determined from the time evolution of the beam current measured after particle have started to hit the aperture. |