A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Pagani, C.

Paper Title Page
TUPEC006 Multiwavelengths Optical Diagnostic during Cs2Te Photocathodes Deposition 1719
 
  • L. Monaco, P.M. Michelato, C. Pagani, D. Sertore
    INFN/LASA, Segrate (MI)
 
 

The production of Cs2Te photoemissive films used as laser driven electron sources in the high brightness photoinjectors at FLASH and PITZ, is a well established activity at INFN Milano since the '90s. Our total production is of more than 100 photocathodes, with an average QE of 8% (@ 254 nm) for fresh films and an operative lifetime that increased up to some months at FLASH. In the last two years, we have improved the standard diagnostic used during the cathode growth to better understand the material properties of the films. This activity is motivated by the need to improve the photocathode properties, mainly the energy distribution of the photoemitted electrons that influences the thermal emittance. The multiwavelengths diagnostic, i.e. the on-line measurements of the photocurrent and reflectivity from the film during its growth in the 239 nm ~ 436 nm range, has been deeply applied on several cathodes and the potentiality of this technique are discussed in this paper.

 
WEPE008 Construction of the S1-Global Cryomodules for ILC 3356
 
  • N. Ohuchi, H. Hayano, N. Higashi, E. Kako, Y. Kondou, H. Nakai, S. Noguchi, T. Saeki, M. Satoh, M. Sawabe, T. Shidara, T. Shishido, A. Terashima, K. Tsuchiya, K. Watanabe, A. Yamamoto, Y. Yamamoto, K. Yokoya
    KEK, Ibaraki
  • T.T. Arkan, S. Barbanotti, H. Carter, M.S. Champion, R.D. Kephart, J.S. Kerby, D.V. Mitchell, Y. Orlov, T.J. Peterson, M.C. Ross
    Fermilab, Batavia
  • A. Bosotti, C. Pagani, R. Paparella, P. Pierini
    INFN/LASA, Segrate (MI)
  • D. Kostin, L. Lilje, A. Matheisen, W.-D. Möller, H. Weise
    DESY, Hamburg
 
 

In an attempt at demonstrating an average field gradient of 31.5 MV/m as per the design accelerating gradient for ILC, a program called S1-Global is in progress as an international research collaboration among KEK, INFN, FNAL, DESY and SLAC. The S1-Global cryomodule will contain eight superconducting cavities from FNAL, DESY and KEK. The cryomodule will be constructed by joining two half-size cryomodules, each 6 m in length. The module containing four cavities from FNAL and DESY has been constructed by INFN. The module for four KEK cavities is being modified at present. The assembly of the cryomodules is scheduled from January 2010, and the operation of the system is scheduled from June 2010 at the KEK-STF. In this paper, the construction of the S1-Global cryomodule will be presented.