TUPE090 Progress in Construction of Gun Test Facility for Compact ERL 2335
 
  • T. Miyajima, K. Haga, K. Harada, T. Honda, Y. Honda, Y. Kobayashi, T.M. Mitsuhashi, S. Nagahashi, E. Nakamura, S. Nozawa, T. Ozaki, S. Sakanaka, K. Satoh, M. Shimada, T. Takahashi, R. Takai, M. Tobiyama, T. Uchiyama, A. Ueda, M. Yamamoto
    KEK, Ibaraki
  • S. Matsuba
    Hiroshima University, Graduate School of Science, Higashi-Hiroshima
  • T. Muto
    Tohoku University, School of Scinece, Sendai
 
 

Com­pact ERL (cERL) is a test ac­cel­er­a­tor to es­tab­lish ac­cel­er­a­tor tech­nolo­gies for GeV-class syn­chrotron light source based on ERL (En­er­gy Re­cov­ery Linac), and will be con­struct­ed in KEK. It con­sists of an in­jec­tor with photo cath­ode 500 kV DC gun, a merg­er sec­tion, super con­duct­ing RF cav­i­ties for ac­cel­er­a­tion and en­er­gy re­cov­ery, re­turn loops, and a beam dump. To op­er­ate and test the photo cath­ode gun be­fore in­stalling it in the cERL in­jec­tor, Gun Test Fa­cil­i­ty is con­struct­ing in KEK, AR south ex­per­i­men­tal hall. The Gun Test Fa­cil­i­ty has two photo cath­ode guns, 200 kV gun de­vel­oped by Nagoya Uni­ver­si­ty and new 500 kV gun which is being de­vel­oped, laser sys­tem to be emit­ted elec­trons from photo cath­ode sur­face, beam trans­port lines, and a beam di­ag­nos­tics sys­tem. The di­ag­nos­tics sys­tem con­sists of a dou­ble slit emit­tance mea­sure­ment sys­tem, beam po­si­tion mon­i­tors, trans­verse pro­file mon­i­tors, and a de­flect­ing cav­i­ty to mea­sure the bunch length and the lon­gi­tu­di­nal pro­file. In this pre­sen­ta­tion, the progress in the con­struc­tion of the Gun Test Fa­cil­i­ty and the beam dy­nam­ics sim­u­la­tion will be pre­sent­ed.

 
TUPE091 Recent Progress in the Energy Recovery Linac Project in Japan 2338
 
  • S. Sakanaka, M. Akemoto, T. Aoto, D.A. Arakawa, S. Asaoka, A. Enomoto, S. Fukuda, K. Furukawa, T. Furuya, K. Haga, K. Hara, K. Harada, T. Honda, Y. Honda, H. Honma, T. Honma, K. Hosoyama, M. Isawa, E. Kako, T. Kasuga, H. Katagiri, H. Kawata, Y. Kobayashi, Y. Kojima, T. Matsumoto, H. Matsushita, S. Michizono, T.M. Mitsuhashi, T. Miura, T. Miyajima, H. Miyauchi, S. Nagahashi, H. Nakai, H. Nakajima, E. Nakamura, K. Nakanishi, K. Nakao, T. Nogami, S. Noguchi, S. Nozawa, T. Obina, S. Ohsawa, T. Ozaki, C.O. Pak, H. Sakai, H. Sasaki, Y. Sato, K. Satoh, M. Satoh, T. Shidara, M. Shimada, T. Shioya, T. Shishido, T. Suwada, M. Tadano, T. Takahashi, R. Takai, T. Takenaka, Y. Tanimoto, M. Tobiyama, K. Tsuchiya, T. Uchiyama, A. Ueda, K. Umemori, K. Watanabe, M. Yamamoto, S. Yamamoto, Y. Yamamoto, Y. Yano, M. Yoshida
    KEK, Ibaraki
  • M. Adachi, M. Katoh, H. Zen
    UVSOR, Okazaki
  • R. Hajima, R. Nagai, N. Nishimori, M. Sawamura
    JAEA/ERL, Ibaraki
  • H. Hanaki
    JASRI/SPring-8, Hyogo-ken
  • H. Iijima, M. Kuriki
    HU/AdSM, Higashi-Hiroshima
  • I. Ito, H. Kudoh, N. Nakamura, S. Shibuya, K. Shinoe, H. Takaki
    ISSP/SRL, Chiba
  • H. Kurisu
    Yamaguchi University, Ube-Shi
  • M. Kuwahara, T. Nakanishi, S. Okumi
    Nagoya University, Nagoya
  • S. Matsuba
    Hiroshima University, Graduate School of Science, Higashi-Hiroshima
  • T. Muto
    Tohoku University, School of Scinece, Sendai
  • K. Torizuka, D. Yoshitomi
    AIST, Tsukuba
 
 

Fu­ture syn­chrotron light source using a 5-GeV-class en­er­gy re­cov­ery linac (ERL) is under pro­pos­al by our Japanese col­lab­o­ra­tion team, and we are con­duct­ing ac­tive R&D ef­forts for that. We are de­vel­op­ing su­per-bril­liant DC pho­to­cath­ode guns, two types of cry­omod­ules for both in­jec­tor and main su­per­con­duct­ing linacs, 1.3 GHz high CW-pow­er rf sources, and other im­por­tant com­po­nents. We are also con­struct­ing a com­pact ERL for demon­strat­ing the re­cir­cu­la­tion of low-emit­tance, high-cur­rent beams using those key com­po­nents. We pre­sent our re­cent progress in this pro­ject.

 
WEPEA034 Development and Operational Status of PF-Ring and PF-AR 2561
 
  • T. Honda, T. Aoto, S. Asaoka, K. Ebihara, K. Furukawa, K. Haga, K. Harada, Y. Honda, T. Ieiri, N. Iida, M. Izawa, T. Kageyama, M. Kikuchi, Y. Kobayashi, K. Marutsuka, A. Mishina, T. Miyajima, H. Miyauchi, S. Nagahashi, T.T. Nakamura, T. Nogami, T. Obina, K. Oide, M. Ono, T. Ozaki, C.O. Pak, H. Sakai, H. Sakai, Y. Sakamoto, S. Sakanaka, H. Sasaki, Y. Sato, K. Satoh, M. Shimada, T. Shioya, M. Tadano, T. Tahara, T. Takahashi, R. Takai, S. Takasaki, Y. Tanimoto, M. Tobiyama, K. Tsuchiya, T. Uchiyama, A. Ueda, K. Umemori, M. Yamamoto, Ma. Yoshida, S.I. Yoshimoto
    KEK, Ibaraki
 
 

KEK man­ages two syn­chrotron ra­di­a­tion sources, Pho­ton Fac­to­ry stor­age ring (PF-ring) of 2.5 GeV and Pho­ton Fac­to­ry ad­vanced ring (PF-AR) of 6.5 GeV. These rings share an in­jec­tor linac with the two main rings of KEK B-fac­to­ry, 8-GeV HER and 3.5-GeV LER. Re­cent­ly, the linac has suc­ceed­ed in a pulse by pulse mul­ti-en­er­gy ac­cel­er­a­tion. A top-up op­er­a­tion of PF-ring has been re­al­ized as the si­mul­ta­ne­ous con­tin­u­ous in­jec­tion to the 3 rings, PF-ring, HER and LER. De­vel­op­ment of new in­jec­tion scheme using a pulsed sex­tupole mag­net con­tin­ues aim­ing at prac­ti­cal use in the top-up op­er­a­tion. A rapid-po­lar­iza­tion-switch­ing de­vice con­sist­ing of tan­dem two AP­PLE-II type un­du­la­tors has been de­vel­oped at PF-ring. The first un­du­la­tor was in­stalled in 2008, and the sec­ond one will be in­stalled in 2010 sum­mer. PF-AR, op­er­at­ed in a sin­gle-bunch mode at all times, has been suf­fered from sud­den life­time drop phe­nom­e­na at­tribut­ed to dust trap­ping for many years. Using the mov­able elec­trodes in­stalled for ex­per­i­ment, we con­firmed that the dis­charge cre­at­ed by the elec­trode was fol­lowed by the dust trap­ping, and suc­ceed­ed in a vi­su­al ob­ser­va­tion of lu­mi­nous dust streak­ing in front of CCD cam­eras.

 
WEPD060 Update of Main Magnet Power Supplies at Pf-Ar 3233
 
  • T. Ozaki, A. Akiyama, K. Harada, T. Kasuga, Y. Kobayashi, T. Miyajima, S. Nagahashi, T.T. Nakamura, M. Ono, T. Sueno
    KEK, Ibaraki
 
 

At PF-AR, a bend­ing mag­net power sup­ply was up­dat­ed in 2007. The con­vert­er works in the 3 pulsed PWM. A trou­ble caused by high­er har­mon­ics above 40th had oc­curred. We man­u­fac­tured fil­ters and in­stalled in 6.6kV ac lines in 2008. Fur­ther­more, a QF mag­net power sup­ply was up­dat­ed in 2009. This paper re­ports on the up­date of PF-AR main mag­net power sup­plies.