A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Orlov, Y.

Paper Title Page
MOPEB050 Superconducting Magnets for SCRF Cryomodules at Front End of Linear Accelerators 379
 
  • V.S. Kashikhin, N. Andreev, Y. Orlov, D.F. Orris, M.A. Tartaglia
    Fermilab, Batavia
 
 

Linear accelerators based on a superconducting technology need various superconducting magnets installed inside SCRF Cryomodules. At front end of Linear Accelerators installed relatively weak iron-dominated magnets. The focusing quadrupoles have integrated gradients in the range of 1 T - 4 T, and apertures 35 mm - 90 mm. At Fermilab were designed superconducting dipole correctors, and quadrupoles for various projects. In the paper presented these magnet designs, and test results of fabricated dipole corrector. There are also briefly discussed: magnetic and mechanical designs, quench protection, cooling, fabrication, and assembly inside cryomodule.

 
WEPE008 Construction of the S1-Global Cryomodules for ILC 3356
 
  • N. Ohuchi, H. Hayano, N. Higashi, E. Kako, Y. Kondou, H. Nakai, S. Noguchi, T. Saeki, M. Satoh, M. Sawabe, T. Shidara, T. Shishido, A. Terashima, K. Tsuchiya, K. Watanabe, A. Yamamoto, Y. Yamamoto, K. Yokoya
    KEK, Ibaraki
  • T.T. Arkan, S. Barbanotti, H. Carter, M.S. Champion, R.D. Kephart, J.S. Kerby, D.V. Mitchell, Y. Orlov, T.J. Peterson, M.C. Ross
    Fermilab, Batavia
  • A. Bosotti, C. Pagani, R. Paparella, P. Pierini
    INFN/LASA, Segrate (MI)
  • D. Kostin, L. Lilje, A. Matheisen, W.-D. Möller, H. Weise
    DESY, Hamburg
 
 

In an attempt at demonstrating an average field gradient of 31.5 MV/m as per the design accelerating gradient for ILC, a program called S1-Global is in progress as an international research collaboration among KEK, INFN, FNAL, DESY and SLAC. The S1-Global cryomodule will contain eight superconducting cavities from FNAL, DESY and KEK. The cryomodule will be constructed by joining two half-size cryomodules, each 6 m in length. The module containing four cavities from FNAL and DESY has been constructed by INFN. The module for four KEK cavities is being modified at present. The assembly of the cryomodules is scheduled from January 2010, and the operation of the system is scheduled from June 2010 at the KEK-STF. In this paper, the construction of the S1-Global cryomodule will be presented.