Paper | Title | Page |
---|---|---|
MOPEC052 | KEK Digital Accelerator for Material and Biological Sciences | 576 |
|
||
A novel circular accelerator capable of accelerating any ions from an extremely low energy to relativistic energy is discussed. A digital accelerator (DA)* is based on the induction synchrotron concept, which had been demonstrated in 2006. All ions are captured and accelerated with pulse voltages generated by induction acceleration cell (IAC). The IAC is energized by the switching power supply, in which power solid-state conductors are employed as switching elements and their tuning on/off is maneuvered by gate signals digitally manipulated from the circulating signal of an ion beam. Acceleration synchronized with the revolution of the ion beam is always guaranteed. The concept is realized by renovating the KEK 500 MeV booster into the DA, introducing a laser ablation ion source. Ion energy of 85-140 MeV/au and intensity of 10+9 - 10+10 /sec are estimated and these ions will be delivered without any large-scale injector. Companion papers** will discuss more details of instruments of DA. Applications for innovative material sciences and life sciences will be briefly introduced as well as the outline of DA. *K. Takayam, J. of Appl. Phys. 101 (2007) 063304. |
||
THPEB010 | Electrostatic Septum for 50GeV Proton Synchrotron in J-PARC | 3900 |
|
||
The two electrostatic septa are one of the most important device for the slow extraction in 50GeV proton synchrotron. We have developed the thin ribbon type septum in order to reduce the beam loss. If alignment of ribbons is poor, the effective thickness seen from the beam become large, and it would increase the beam-hitting rate. The alignment of ribbon over 1.5m long septa was measured by a laser-focus displacement meter. The achieved effective thickness of septa is estimated to be 0.075mm and 0.080mm respectively. We will report a high voltage conditioning and a performance under beam commissioning. |
||
THPEB014 | Status and Upgrade Plan of Slow Extraction from the J-PARC Main Ring | 3912 |
|
||
High power protons from the J-PARC main ring is slowly extracted using the third integer resonance and delivered to the experimental hall for various nuclear and particle physics experiments. The slow extraction device comprises two electro static septa (ESS),ten magnetic septa, four bump magnets, eight resonant sextupole magnets and their power supply. One of the critical issue of the slow extraction is radiation caused by the beam loss during the slow extraction. We have developed the electrostatic and magnetic septa with thin septum thickness. A unique scheme with large step size and small angular spread of the extracted beam enables hit rate on the ESS less than 1% level. In January 2009, first 30 GeV proton beam has been successfully delivered to the fixed target. Quadrupole magnets and a DSP feedback control system to obtain a uniform beam spill structure were implemented in 2009 summer shutdown period. We will report the extraction efficiency, extracted beam profiles and spill structure obtained by the beam commissioning so far. We will also mention a upgrade plan based on some new ideas to aim a higher performance. |
||
THPEB022 | Beam Spill Control for the J-PARC Slow Extraction | 3933 |
|
||
The slow extraction beam from the J-PARC Main Ring (MR) to the Hadron Experimental Facility is used in various nuclear and particle physics experiments. A flat structure and low ripple noise are required for the spills of the slow extraction. The spill control system has been developed for the J-PARC slow extraction to make a flat structure and small ripple. It consists of the extraction quadrupole magnets and feedback device. The extraction magnets consist of two kinds of quadrupole magnets, EQ (Extraction Q-magnet) which make flat beam and RQ (Ripple Q-magnet) which reject the high frequent ripple noise. The feedback system, which is using Digital Signal Processor (DSP), makes a ramping pattern for EQ and RQ from spill beam monitor. The extraction magnets and feedback device were installed in September 2009, and spill feedback study were successfully started from the beam time in October 2009. Here we report the operation status of magnets and first study of beam commissioning with spill feedback. |