TUPEA048 | Low Level RF System for cERL | 1440 |
|
||
The compact ERL(cERL) is the energy recovery linac(ERL) test facility that is under construction at KEK. The stability of accelerating electric field of 0.1% rms in amplitude and 0.1deg. in phase is required for LLRF system. The status of LLRF system for cERL will be reported. |
||
WEPEB003 | Fully Embedded EPICS-based Control of Low Level RF System for SuperKEKB | 2686 |
|
||
Gazing at SuperKEKB project, a new control subsystem was designed and implemented to upgrade the low level RF system of the KEKB accelerator based on Experimental and Industrial Control System (EPICS). The new control subsystem comprises a uTCA, a PLC, and an industrial PC. Each card plugged in the uTCA chassis and the PLC function as an embedded Input / Output Controller (IOC) by running the EPICS core program on the Linux operating system. The industrial PC runs Extensible Display Manger on Linux to serve as an Operator Interface (OPI). This paper describes the details of the design and the implementation of the fully embedded EPICS-based low level RF control subsystem for SuperKEKB. |
||
WEPEB007 | The Data Acquisition System of Beam Position Monitors in J-PARC Main Ring | 2698 |
|
||
The Data Acquisition System of Beam Position Monitors(BPMs) in J-PARC Main Ring are consist of 186 Linux-based Data Processing Cirquits(BPMCs) and 12 EPICS IOCs. They are important tool to see the COD and turn-by-turn beam positions. This report describes the process of the data reconstruction which include how the various calibration constants are applied. |
||
MOPE012 | Performance of the Main Ring BPM during the Beam Commissioning at J-PARC | 981 |
|
||
Experiences of operating BPM's during beam commissioning at the J-PARC MR are reported. The subjects are: (1) bug report, statistics and especially the effect of a beam duct step, (2) position resolution estimation (<30 micrometers with 1 sec averaging), (3) beam based alignment. |
||
WEPEB020 | Control of the Pulse Magnet Power Supply by EPICS IOC Embedded PLC | 2731 |
|
||
The EPICS embedded programmable logic controller (PLC) has been developed based on F3RP61-2L, a CPU module of a FA-M3R series PLC running Linux OS. The EPICS IOC resided in F3RP61-2L module can access the registers of sequence CPU modules and I/O modules of the PLC. The embedded EPICS PLC was applied to control the prototype of pulse magnet power supply and support functionality testing remotely. The system comprises various input/output modules and a CPU module with built-in Ethernet interface. The control information (status of the power supply, ON, OFF, warn up, reset, read/write voltage, etc.) can be accessed remotely using EPICS client tools. The EDM is selected to develop the GUI for itself. Efforts are summarized in this report. |
||
THPEB022 | Beam Spill Control for the J-PARC Slow Extraction | 3933 |
|
||
The slow extraction beam from the J-PARC Main Ring (MR) to the Hadron Experimental Facility is used in various nuclear and particle physics experiments. A flat structure and low ripple noise are required for the spills of the slow extraction. The spill control system has been developed for the J-PARC slow extraction to make a flat structure and small ripple. It consists of the extraction quadrupole magnets and feedback device. The extraction magnets consist of two kinds of quadrupole magnets, EQ (Extraction Q-magnet) which make flat beam and RQ (Ripple Q-magnet) which reject the high frequent ripple noise. The feedback system, which is using Digital Signal Processor (DSP), makes a ramping pattern for EQ and RQ from spill beam monitor. The extraction magnets and feedback device were installed in September 2009, and spill feedback study were successfully started from the beam time in October 2009. Here we report the operation status of magnets and first study of beam commissioning with spill feedback. |