Paper | Title | Page |
---|---|---|
WEPEB006 | Present Status of MPS and TS for IFMIF/EVEDA Accelerator | 2695 |
|
||
Control System for IFMIF/EVEDA accelerator prototype consists of the six subsystems; Central Control System (CCS), Local Area Network (LAN), Personnel Protection System (PPS), Machine Protection System (MPS), Timing System (TS) and Local Control System (LCS). The subsystems have been designed and their test benches been fabricated at JAEA. The IFMIF/EVEDA accelerator prototype provides a deuteron beam with the power more than 1 MW, which is as same as that in cases of J-PARC and SNS. In the control system, MPS and TS with high performance and precision are strongly required to avoid the radio-activation of the accelerator components. The prototypes of the MPS and TS are testing in conjunction with the injector test starting at CEA/Saclay from autumn in 2010. These results will feedback the design and the fabrication of the control components. This paper presents the development status of the TS modules and EPICS drivers for TS and MPS, and the prospects to apply them to the Injector test. |