A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Naik, V.

Paper Title Page
THPEA002 RF Systems of the VEC-RIB Facility 3676
 
  • H.K. Pandey, A. Bandyopadhyay, A. Chakrabarti, S. Dechoudhury, D.P. Dutta, T.K. Mandi, V. Naik
    DAE/VECC, Calcutta
  • A.K. Basu, A. Kumar, K. P. Ray
    SAMEER, Mumbai
 
 

An isotope separator on-line Rare Isotope Beam (RIB) facility is presently under development at VECC, Kolkata around the existing K=130 room temp cyclotron. In first stage the low-energy (1.7 keV/u; q/A ≤ 1/14) RIB will be accelerated to about 470 keV/u in the Radio Frequency Quadrupole (RFQ) linac followed by three IH-LINAC. This consists of seven different rf systems for RFQ, three re-buncher and three IH-Linac cavities each operating in CW mode. The 3.4 meter rod type RFQ and the four gap λ/4 re-buncher is designed to operate at 37.8 MHz. The RFQ and re-buncher has been installed and successfully operated at CW rf power. The first beam testing for O5+ has been done with proper phase locking between rf transmitters. Two DTL accelerator systems consist of IH-mode tank operating at 37.8 MHz and other with 75.6 MHz. The first IH linac has been installed in beam line and tested with nominal RF power. The Second IH-linac cavity has been fabricated and is undergoing low power rf test. Two other buncher cavities are presently under development. The rf systems with low power as well as high power testing for above accelerator cavities will be described in this paper.

 
THPD001 Electron Linac Photo-fission Driver for the Rare Isotope Program at TRIUMF 4275
 
  • S.R. Koscielniak, F. Ames, R.A. Baartman, P.G. Bricault, I.V. Bylinskii, Y.-C. Chao, K. Fong, R.E. Laxdal, M. Marchetto, L. Merminga, A.K. Mitra, I. Sekachev, V.A. Verzilov, V. Zvyagintsev
    TRIUMF, Vancouver
  • A. Chakrabarti, S. Dechoudhury, M. Mondal, V. Naik
    DAE/VECC, Calcutta
 
 

In July 2009 TRIUMF, in collaboration with the University of Victoria and other partners, was awarded Canadian federal government funds for the construction of an electron linear accelerator (e-linac) in support of its expanding rare isotope beam (RIB) program. The project anticipates Provincial funds for the construction of buildings to be announced in June 2010. TRIUMF has embarked on the detailed design for the 10 MeV Injector cryomodule and the first of two 20 MeV Accelerator cryomodules (ACMs), all rated up to 10 mA. The project first stage, ICM and ACM1, providing 25 MeV 4 mA is planned to be completed in November 2013. The injector is being fast tracked in a collaboration with the VECC in Kolkata, India. This paper gives an overview of the facility layout, and accelerator design progress including beam dynamics and cryomodule concept.