Paper | Title | Page |
---|---|---|
WEPEA063 | Status of NESTOR Facility | 2630 |
|
||
The status of X-ray generator NESTOR that is under construction in Kharkov Institute of Physics and Technology is described in the paper. |
||
THPEB079 | Survey and Alignment Strategy for Compton X-ray Generator NESTOR | 4053 |
|
||
NESTOR facility that is under construction in NSC KIPT (Kharkov, Ukraine) consists of compact 225 MeV electron storage ring, 100 MeV linear accelerator-injector, laser optical system and radiation channel. To provide effective and cheap survey and alignment system for compact facility is crucial task in order to achieve designed X-ray parameters (X-ray intensity up to 1012 phot/s). In the article the survey and alignment strategy of Compton generator NESTOR is described. The system uses traditional triangulation method and provides the accuracy of technological equipment alignment equal to 100 mkm. |