A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Munoz, M.     [Muñoz, M.]

Paper Title Page
WEPEA056 Beam Optics Measurements During the Commissioning of the ALBA Booster 2612
 
  • G. Benedetti, D. Einfeld, Z. Martí, M. Muñoz
    CELLS-ALBA Synchrotron, Cerdanyola del Vallès
 
 

The com­mis­sion­ing of the boost­er for the syn­chrotron light source ALBA should take place in the pe­ri­od De­cem­ber 2009-Jan­uary 2010. In this paper, the beam dy­nam­ics as­pects of the com­mis­sion­ing are de­scribed, in­clud­ing the stud­ies per­formed, the main prob­lems find dur­ing the com­mis­sion­ing and a com­par­i­son of the mea­sured beam pa­ram­e­ters to the de­sign one. A de­scrip­tion of the soft­ware tools used and de­vel­oped for the task is in­clud­ed.

 
THPE076 Effect of the Phase One Insertion Devices in the ALBA Storage Ring 4695
 
  • Z. Martí, G. Benedetti, D. Einfeld, M. Muñoz
    CELLS-ALBA Synchrotron, Cerdanyola del Vallès
 
 

The syn­chrotron light source ALBA in­cor­po­rates 6 in­ser­tion de­vices (2 Ap­ple-II type un­du­la­tors, 2 plan­nar in-vac­u­um un­du­la­tors, 1 nor­mal con­duct­ing mul­ti­pole wig­gler and 1 su­per­con­duc­tion mul­ti­pole wig­gler) at the start of op­er­a­tion. The ef­fect of the dif­fer­ent IDs in the per­for­mance of the fa­cil­i­ty is eval­u­at­ed, using sev­er­al meth­ods (kick maps, hard edge mod­els, dy­nam­ic mul­ti­poles, …), in­clud­ing a com­par­i­son of the agree­ment of the dif­fer­ent mod­els and sim­u­la­tion codes. Ac­cord­ing to the re­sults, and due main­ly to the in­flu­ence of the su­per­con­duct­ing wig­gler, a new work­ing point has been se­lect­ed.

 
THPE077 Predicted Effect of the Measured High Order Magnetic Multipole in the ALBA Storage Ring 4698
 
  • M. Muñoz, G. Benedetti, D. Einfeld, Z. Martí
    CELLS-ALBA Synchrotron, Cerdanyola del Vallès
 
 

The high order mag­net­ic mul­ti­pole com­po­nents of all the mag­nets in the ALBA stor­age ring have been mea­sured. Pre­vi­ous stud­ies have sim­u­lat­ed the ef­fects of the HOMs using statis­tic meth­ods. The mag­nets have been in­stalled now in the tun­nel, al­low­ing for a bet­ter sim­u­la­tion of the fu­ture im­pact of the HOMs in the per­for­mance of the light source. In this paper, the ef­fect of the high order mul­ti­poles of the dipole, quadrupole and sex­tupole mag­nets in the dy­nam­ic aper­ture and the Tou­schek life­time are re­viewed.