Paper | Title | Page |
---|---|---|
TUPEB061 | A Novel Extraction Scheme from a Synchrotron Using a Magnetic Shield | 1656 |
|
||
A new beam extraction scheme from a synchrotron is put forward. The main difference from other schemes of extraction is the use of a magnetic shields instead of a septum. Magnetic shields are located in the central dipole magnets of a pulsed chicane. The magnetic shield is a multi-layer copper-iron tube. Numerical simulations and experimental results for the magnetic shield are presented. A good accordance between them has shown. The advantages of the new scheme are easy technical implementation and compactness. The area of application is extraction from a synchrotron. The proposed scheme will be used in a new synchrotron radiation source in Novosibirsk. |
||
WEOARA03 | Novosibirsk Free Electron Laser Facility: Two-orbit ERL with Two FELs | 2427 |
|
||
The Novosibirsk ERL has rather complicated magnetic system. One orbit (11-MeV) for terahertz FEL lies in the vertical plane. Other four orbits lie in the horizontal plane. The beam is directed to these orbits by switching on of two round magnets. In this case electrons pass through RF cavities four times, obtaining 40-MeV. At the 4th orbit the beam is used in FEL, and then is decelerated four times. At the 2nd orbit (20 MeV) we have a bypass with another FEL. When bypass magnets are switched on, the beam passes through this FEL. The length of bypass is chosen to provide the delay necessary to realize deceleration at the3rd pass through accelerating cavities. In 2008 two of four horizontal orbits were assembled and commissioned. The electron beam was accelerated twice and then decelerated down to low injection energy. First multi-orbit ERL operation was demonstrated successfully. In 2009 the first lasing at the second FEL, installed on the bypass of the second track, was achieved. The wavelength tunability range is 40 - 80 micron. Energy recovery of a high energy spread used electron beam was optimized. Third and fourth orbit assembly is in progress. |
||
|