MOPEC060 Engineering Design and First Prototype Tests of the IFMIF-EVEDA RFQ 600
 
  • A. Pepato, R. Dima, F. Scantamburlo
    INFN- Sez. di Padova, Padova
  • M. Comunian, E. Fagotti, F. Grespan, A. Palmieri, A. Pisent, C. Roncolato
    INFN/LNL, Legnaro (PD)
  • D. Dattola, P. Mereu
    INFN-Torino, Torino
 
 

In the framework of the IFMIF/EVEDA project, the RFQ is a 9.8 m long cavity, with very challenging mechanicals specification. In the base line design, the accelerator tank is composed of 18 modules that are flanged together. The construction procedure of each module foresees the horizontal brazing of the four electrodes and then the vertical brazing of the flanges. A RFQ prototype, composed of 2 modules, aimed at testing all the mechanical construction procedure is under construction. In this article, the progress of the prototype construction and the progresses in the design and engineering phase, as well the description of all the fabrication phases is reported.

 
MOPEC061 The IFMIF RFQ Real-scale Aluminum Model: RF Measurements and Tuning 603
 
  • A. Palmieri, F. Grespan
    INFN/LNL, Legnaro (PD)
  • G. Cotto
    Torino University, ., Torino
  • D. Dattola, P. Mereu
    INFN-Torino, Torino
 
 

In order to validate the tuning and stabilization procedures established for the IFMIF RFQ, a campaign of low power tests on an aluminum real-scale RFQ built on purpose has been carried out. Such campaign consisted of the determination of mode spectra, the measurements of the electric field distribution with bead pulling technique, and the implementation of the tuning procedure. The main outcomes and results obtained are reported in the article.