A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Matli, E.

Paper Title Page
THOBMH02 Results from the 2009 Beam Commissioning of the CERN Multi-turn Extraction 3619
 
  • M. Giovannozzi, E. Benedetto, A. Blas, T. Bohl, S. Cettour Cave, K. Cornelis, D.G. Cotte, H. Damerau, M. Delrieux, J. Fleuret, F. Follin, T. Fowler, P. Freyermuth, H. Genoud, S.S. Gilardoni, S. Hancock, O. Hans, Y. Le Borgne, D. Manglunki, E. Matli, G. Metral, E. Métral, M. Newman, L. Pereira, F.C. Peters, Y. Riva, F. Roncarolo, L. Sermeus, R.R. Steerenberg, B. Vandorpe, J. Wenninger
    CERN, Geneva
  • F. Franchi
    ESRF, Grenoble
 
 

Fol­low­ing the anal­y­sis of the re­sults ob­tained dur­ing the first year of beam com­mis­sion­ing of the CERN mul­ti-turn ex­trac­tion, a num­ber of changes have been in­tro­duced in the beam ma­nip­u­la­tions per­formed in the CERN Pro­ton Syn­chrotron. This in­cludes a dif­fer­ent con­trol of the lin­ear chro­matic­i­ty, the set­ting of the non-lin­ear mag­nets used to split the beam, and the lon­gi­tu­di­nal struc­ture in the PS. The re­sults ob­tained dur­ing the 2009 run are pre­sent­ed and dis­cussed in de­tail, in­clud­ing the beam per­for­mance in both the PS and the SPS, as well as the op­tics mea­sure­ments in the trans­fer line be­tween the two cir­cu­lar ma­chines.

 

slides icon

Slides