A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Luedecke, H.L.

Paper Title Page
TUPE010 Status of the Photo Injector Test Facility at DESY, Zeuthen Site (PITZ) 2164
 
  • G. Asova, J.W. Bähr, C.H. Boulware, A. Donat, U. Gensch, H.-J. Grabosch, L. Hakobyan, H. Henschel, M. Hänel, Ye. Ivanisenko, L. Jachmann, M.A. Khojoyan, W. Köhler, G. Koss, M. Krasilnikov, A. Kretzschmann, H. Leich, H.L. Luedecke, J. Meissner, B. Petrosyan, M. Pohl, S. Riemann, S. Rimjaem, M. Sachwitz, B. Schoeneich, J. Schultze, A. Shapovalov, R. Spesyvtsev, L. Staykov, F. Stephan, F. Tonisch, G. Trowitzsch, G. Vashchenko, L.V. Vu, T. Walter, S. Weisse, R.W. Wenndorff, M. Winde
    DESY Zeuthen, Zeuthen
  • K. Flöttmann, S. Lederer, S. Schreiber
    DESY, Hamburg
  • D.J. Holder, B.D. Muratori
    STFC/DL/ASTeC, Daresbury, Warrington, Cheshire
  • R. Richter
    Helmholtz-Zentrum Berlin für Materialien und Energie GmbH, Berlin
  • J. Rönsch-Schulenburg
    Uni HH, Hamburg
 
 

The PITZ facility is established for the development and testing of electron sources for FELs like FLASH and the European XFEL. The facility has been upgraded during the shutdown starting in summer 2007 to extend the capability of the facility to produce and characterize low emittance electron beams. The upgraded setup mainly includes a photo cathode L-band RF gun with solenoid magnets for space charge compensation, a post acceleration booster cavity and several diagnostic systems. The diagnostic systems consist of charge and beam profile monitors, emittance measurement systems and spectrometers with related diagnostics in dispersive arms after the gun and the booster cavities. RF gun operation with an accelerating gradient of 60 MV/m at the cathode is realized with this setup. A new photo cathode laser system with broader spectral bandwidth was installed for optimizing the temporal distribution of the laser pulses regarding to electron beam properties. Experimental results with this setup demonstrated very high electron beam quality as required for the photoinjector source of the European XFEL. In this contribution, the PITZ facility setup in year 2008-2009 will be presented.


*for the PITZ Collaboration