Paper | Title | Page |
---|---|---|
WEPE101 | A 4-MW Target Station for a Muon Collider or Neutrino Factory | 3590 |
|
||
We outline a program of engineering design and simulation for a target station and pion production/capture system for a 4-MW proton beam at the front end of a Muon Collider or a Neutrino Factory. The target system consists of a free liquid-metal (nominally mercury) jet immersed in a high-field solenoid magnet capture system that also incorporates the proton beam dump. Topics to be studied include optimization of proton beam and jet target parameters, of the magnetic configuration for capture and subsequent transport of pions and muons, of the beam dump, of the radiation/thermal shielding of the capture magnets, and of the beam windows. |
||
WEPE078 | The MERIT High-Power Target Experiment at the CERN PS | 3527 |
|
||
We report on the analysis of data collected in the MERIT experiment at CERN during the Fall of 2007. These results validate the concept of a free mercury jet inside a high-field solenoid magnet as a target for a pulsed proton beam of 4-MW power, as needed for a future Muon Collider and/or Neutrino Factory. |