A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Lizarazo, J.

Paper Title Page
MOPEB059 Assembly and Test of a 120 mm Bore 15 T Nb3Sn Quadrupole for the LHC Upgrade 403
 
  • S. Caspi, D.W. Cheng, D.R. Dietderich, H. Felice, P. Ferracin, R.R. Hafalia, J.M. Joseph, J. Lizarazo, G.L. Sabbi, X. Wang
    LBNL, Berkeley, California
  • G. Ambrosio, R. Bossert, A.V. Zlobin
    Fermilab, Batavia
  • M. Anerella, A.K. Ghosh, J. Schmalzle, P. Wanderer
    BNL, Upton, Long Island, New York
 
 

Advanced superconductors such as Nb3Sn are being considered for future magnet upgrades of the Large Hadron Collider (LHC) at CERN. The US LHC Accelerator Research Program (LARP) has developed a large bore (120mm) Nb3Sn IR quadrupole (HQ) capable of reaching 15 T at its conductor and a gradients of 199T/m at 4.4K and 219T/m at 1.9K. HQ is addressing coil alignment and accelerator field quality in a shell-based mechanical structure. In this paper we summarize the fabrication, assembly and initial test results of the 1 m long two-layer magnet.