Paper | Title | Page |
---|---|---|
MOPEB074 | Calculation and Design of a High Voltage Electron Accelerator | 441 |
|
||
High voltage electron accelerators are currently utilized in various industrial applications for Crosslinking Compounds, Sterilization, Polymerization, and vulcanization etc. The conceptual design of a high voltage electron accelerator for radiation technologies is considered in the paper. The key components of the electron accelerator are introduced and analyzed. Relevant physical parameters of the accelerator are then obtained. In order to verify the rationality of the design, beam optical paths are calculated by TRANSPORT program. The beam envelopes show that the physical design of this system can meet the requirement of engineering. |
||
THPEA030 | Design and Analysis of RF Cavities for the Cyclotron CYCHU-10 | 3744 |
|
||
The design study of a 10MeV compact cyclotron CYCHU-10 has been developed at Huazhong University of Science and Technology (HUST). We developed the basic shapes and dimensions and carried out the simulations for the CYCHU-10 cavities with 3D numerical calculation softwares in this paper. The distributions of electromagnetic field are illustrated by means of the electromagnetic and structural analysis, and the wooden model test is preformed as well. In addition, this paper gives mechanical tolerance effects which deformed due to the limit of mechanical working of cavities under practical conditions. This work helps to evaluate the performances of capacitive frequency trimmer design. |
||
MOPEB060 | Lessons Learned for the MICE Coupling Solenoid from the MICE Spectrometer Solenoids | 406 |
|
||
Tests of the spectrometer solenoids have taught us some important lessons. The spectrometer magnet lessons learned fall into two broad categories that involve the two stages of the coolers that are used to cool the magnets. On the first spectrometer magnet, the problems were centered on the connection of the cooler 2nd-stage to the magnet cold mass. On the second spectrometer magnet, the problems were centered on the cooler 1st-stage temperature and the connections between leads, the cold mass support intercept, and the shields to the cooler first-stage. If the cooler 1st-stage temperature is too high, the refrigerator will not produce full 2nd stage cooling. If the 1st-stage temperature is too high, the temperature of the top of the HTS leads. As a result, more heat goes into the 4 K cold mass and the temperature margin of the top of the HTS leads is too small, which are in a magnetic field. The parameters that affect the magnet cooling are compared for the MICE coupling magnet and the spectrometer magnet. |
||
WEPEA067 | Design Studies for a VUV-Soft X-ray FEL Facility at LBNL | 2639 |
|
||
Recent reports have identified the scientific requirements for a future soft x-ray light source and a high-repetition-rate FEL facility responsive to them is being studied at LBNL. The facility is based on a CW superconducting linear accelerator with beam supplied by a high-brightness, high-repetition-rate photocathode electron gun, and on an array of FELs to which the beam is distributed, each operating at high repetition rate and with even pulse spacing. Dependent on the experimental requirements, the individual FELs may be configured for either SASE, HGHG, EEHG, or oscillator mode of operation, and will produce high peak and average brightness x-rays with a flexible pulse format ranging from sub-femtoseconds to hundreds of femtoseconds. We are developing a design concept for a 10‐beamline, coherent, soft x‐ray FEL array powered by a 2.5 GeV superconducting accelerator operating with a 1 MHz bunch repetition rate. Electron bunches are fanned out through a spreader, distributing beams to an array of 10 independently configurable FEL beamlines with nominal bunch rates up to 100 kHz. Additionally, one beamline could be configured to operate at higher repetition rate. |
||
THPEA046 | The MuCool Test Area and RF Program | 3780 |
|
||
TThe MuCool RF Program focuses on the study of normal conducting RF structures operating in high magnetic field for applications in muon ionization cooling for Neutrino Factories and Muon Colliders. This paper will give an overview of the program, which will include a description of the test facility and its capabilities, the current test program, and the status of a cavity that can be rotated in the magnetic field which allows for a more detailed study of the maximum stable operating gradient vs. magnetic field strength and angle. |
||
THPEA049 | Normal Conducting RF Cavity for MICE | 3786 |
|
||
Normal conducting RF cavities must be used for the cooling section of international Muon Ionization Cooling Experiment (MICE) which is currently under construction at Rutherford Appleton Laboratory (RAL) in UK. Eight 201-MHz cavities are needed for the MICE cooling section; fabrication of the first five cavities is nearly complete. This paper reports the cavity fabrication status that includes the cavity design, fabrication techniques and preliminary low power RF measurements of the first five cavities. |