Paper | Title | Page |
---|---|---|
THPEB076 | Utility Cooling System Design for the Taiwan Photon Source | 4044 |
|
||
National Synchrotron Radiation Research Center (NSRRC) in Taiwan has finished an open bid about utility system for Taiwan photon source (TPS). The detail design and criteria of the utility cooling system, including cooling water and air conditioning system, have also been considered and confirmed. From controls to facility, all devices were designed and optimized to meet critical requirements of high reliability and stability. Besides, the paper mainly focuses on thermal load evaluation and removes to achieve the best efficiency and performance of system. The brand new system structure and control strategy also be realized. |
||
THPEB078 | Investigation and Analysis of TLS Electric Power System Harmonics | 4050 |
|
||
The electric power system of Taiwan Photon Source (TPS) will be installed during the construction of TPS. Many power electronic devices which produce large nonlinear loads will be used in the new power system and the accelerator facility. The capacitor banks will also be used for the power factor correction. Thus, the excessive harmonic waveform distortion level on the normal waveform will be presented continuously. These excessive harmonic current flows will result in transformer and cable over-heating and many types of circuit faults, and also wasting energy. A project is initiated to study these harmonic effects which will appear in the electric power system of TPS. A computer simulation approach is used to study the harmonic waveform distortion phenomena, and also to investigate an effective approach to reduce it. The harmonic effects of selected section of TLS (Taiwan Light Source) electric power system, and those appear at the mock segment of 1/24 accelerator of TPS system are measured and compared with the simulated results. |