TUPD044 Horizontal Impedance of the Kicker Magnet of RCS at J-PARC 2024
 
  • Y. Shobuda, J. Kamiya, M. Watanabe
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • T. Toyama
    J-PARC, KEK & JAEA, Ibaraki-ken
 
 

There is the famous formula of the horizontal impedance for the matched-traveling wave kicker. However, the real and the imaginary parts of the impedance do not satisfy the Hilbert transformations. On the other hand, the impedance measured by a loop method does not directly give the beam impedance. In this paper we theoretically derive the beam impedance and reproduce the impedance by using the estimated inductances of the kicker by the loop measurement.

 
WEPD086 Operation of Kicker System using Thyratron of the 3 GeV Rapid Cycling Synchrotron of J-PARC 3296
 
  • M. Watanabe, J. Kamiya, K. Suganuma, T. Takayanagi, N. Tani, T. Togashi, T. Ueno, Y. Watanabe
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
 
 

3 GeV rapid cycling synchrotron (RCS) of J-PARC accelerates proton beams from the 181 MeV up to 3 GeV. The RCS injects the beam to the Main Ring and transports it to the muon production target and neutron production target in the Materials and Life Science Experimental Hall. Proton beams in the RCS are fast extracted by kicker magnets at the repetition rate of 25 Hz. The rise time of the magnetic field is approximately 260 ns due to the propagation time through the coaxial cable and the kicker magnet itself. The flat-top length of it is required to 840 ns in order to extract two beam bunches. Pulse forming lines (PFL) and thyratrons are used to make the rise time and the flat-top, at the maximum charging voltage of 80 kV. Two thyratrons, which is a CX1193C made by e2V Ltd., are used for a power supply. 16 thyratrons are used in the eight power supplies of the kicker system. Since thyratrons are gaseous discharge switching devices, they often make misfire or self-breakdown in several hours. In this paper, present status of operation and voltage adjustment method of the reservoir and cathode heater power supply of the thyratrons in the kicker system are described.

 
THPEA085 Vacuum Performances of Some LHC Collimators 3867
 
  • V. Baglin, G. Bregliozzi, J.M. Jimenez
    CERN, Geneva
  • J. Kamiya
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
 
 

Pressure increases are observed with the first beams circulating in the CERN Large Hadron Collider (LHC) close to some collimators. This paper describes the vacuum performances of the collimators as measured in the laboratory and also the performances obtained in the machine. Based on these observations, estimations of some operational behavior such as pressure increase and NEG reactivation scenario are given.