TUPEC042 | NSLS-II Transport Line Performance | 1820 |
|
||
The NSLS-II injection system consists of a 200 MeV linac and a 3 GeV booster synchrotron and associated transport lines. The transport lines need to transport the beam from the linac to the booster and from the booster to the storage ring in a way that provide high injection efficiency. In this paper we discuss progress on specifying and prototyping the NSLS-II transfer lines including diagnostics, magnet specifications, and safety systems. Commissioning plans are also discussed. |
||
WEPEB067 | Beam Containment System for NSLS-II | 2848 |
|
||
The shielding design for the NSLS-II will provide adequate protection for the full injected beam loss in two periods of the ring around the injection point, but the remainder of the ring is shielded for lower losses of <10% full beam loss. This will require a system to insure that beam losses don't exceed these levels for a period of time that could cause levels outside the shield walls. This beam containment system will measure, provide a level of control and alarm indication of the beam power losses along the beam path from the source (e-gun, linac) thru the injection system and the storage ring. This system will consist of collimators that will provide limits to (an potentially measure) the beam miss-steering and control the loss points of the charge and monitors that will measure the average beam current losses along the beam path and alarm when this beam power loss exceeds the level set by the shielding specifications. This will require some new ideas in beam loss detection capability and collimation. The initial planning and R&D program will be presented. |
||
WEPEA082 | Status of the NSLS-II Injection System Development | 2672 |
|
||
We discuss status and plans of development of the NSLS-II injector. The injector consists of 200 MeV linac, 3-GeV booster, transport lines and injection straight section. The system design is now nearly completed and the injector development is in the procurement phase. The injector commissioning is planned to take place in 2012. |