MOPE011 Shot-by-shot Beam Position Monitor System for Beam Transport Line from RCS to MR in J-PARC 978
 
  • M. Tejima, D.A. Arakawa, Y. Hashimoto
    KEK, Ibaraki
  • K. Hanamura
    MELCO SC, Tsukuba
  • N. Hayashi
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • K. Satou, T. Toyama, N. Yamamoto
    J-PARC, KEK & JAEA, Ibaraki-ken
 
 

To maintain the beam orbit of beam transport line from RCS to MR in J-PARC (3-50BT), 14 beam position monitors (BPMs) were installed. Their signals gathered in the local control building (D01) have been measured by using 14 digitizing oscilloscopes. The data acquisition system have a performance of shot-by-shot measurement.

 
MOPE012 Performance of the Main Ring BPM during the Beam Commissioning at J-PARC 981
 
  • T. Toyama, D.A. Arakawa, S. Hiramatsu, S. Igarashi, S. Lee, H. Matsumoto, J.-I. Odagiri, M. Okada, M. Tejima, M. Tobiyama
    KEK, Ibaraki
  • K. Hanamura, S. Hatakeyama
    MELCO SC, Tsukuba
  • Y. Hashimoto, K. Satou, J. Takano
    J-PARC, KEK & JAEA, Ibaraki-ken
  • N. Hayashi
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
 
 

Experiences of operating BPM's during beam commissioning at the J-PARC MR are reported. The subjects are: (1) bug report, statistics and especially the effect of a beam duct step, (2) position resolution estimation (<30 micrometers with 1 sec averaging), (3) beam based alignment.

 
MOPE020 Beam Based Alignment of the Beam Position Monitor at J-PARC RCS 1005
 
  • N. Hayashi, H. Harada, H. Hotchi
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • M. Tejima
    KEK, Ibaraki
  • T. Toyama
    J-PARC, KEK & JAEA, Ibaraki-ken
 
 

The J-PARC RCS is an M-Watt class rapid cycling synchrotron and it has delivered an intensive beam to the neutron target and the MR. In order to overcome large space charge effect, its physical aperture is designed to be more than 250mm in diameter. Even though its chamber size is very large, the BPM system gives precise data to determine beam optics parameters of the ring. For this purpose, only relative positions and resolutions are important. However, for much higher intensity, the absolute beam position and accurate COD correction are indispensable. We have carefully installed the BPM and measured the position with respect to the quadrupole magnet (QM) nearby. But it is also necessary to estimate its absolute position by using beam. If each QM could be controlled independently, the simple beam based alignment technique can be utilized, but it is not the case for RCS. There are seven families of QM, and only each family can be controlled at one time. We developed a new technique by expanding the simple method for the case of multiple QM focusing changed simultaneously, and applied to the J-PARC RCS. The paper describes this method and discussed about experimental results.

 
WEPEB007 The Data Acquisition System of Beam Position Monitors in J-PARC Main Ring 2698
 
  • S. Hatakeyama, N. Hayashi
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • D.A. Arakawa, Y. Hashimoto, S. Hiramatsu, J.-I. Odagiri, M. Tejima, M. Tobiyama, T. Toyama, N. Yamamoto
    KEK, Ibaraki
  • K. Hanamura
    MELCO SC, Tsukuba
  • K. Satou
    J-PARC, KEK & JAEA, Ibaraki-ken
 
 

The Data Acquisition System of Beam Position Monitors(BPMs) in J-PARC Main Ring are consist of 186 Linux-based Data Processing Cirquits(BPMCs) and 12 EPICS IOCs. They are important tool to see the COD and turn-by-turn beam positions. This report describes the process of the data reconstruction which include how the various calibration constants are applied.

 
WEPEB065 Beam Loss of J-PARC Rapid Cycling Synchrotron at Several Hundred kW Operation 2842
 
  • K. Yamamoto, H. Harada, S. Hatakeyama, N. Hayashi, H. Hotchi, P.K. Saha, M. Yoshimoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • R. Saeki
    KEK/JAEA, Ibaraki-Ken
 
 

A 3GeV Rapid-Cycling Synchrotron (RCS) in Japan Proton Accelerator Research Complex (J-PARC) has continuously provided more than 100kW proton beam to the Neutron target since October 2009. And we also successfully accelerated 300kW beam for one hour on December 10th by way of trial. We found some problems through these experiences. We report those problems and the residual dose in such high intensity operation.

 
THPEB020 Beam Study Results with HBC Stripping Foils at the 3-GeV RCS in J-PARC 3927
 
  • M. Yoshimoto, H. Harada, N. Hayashi, H. Hotchi, Y. Irie, M. Kawase, M. Kinsho, R. Saeki, P.K. Saha, K. Yamamoto, Y. Yamazaki
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • T. Ishiyama
    KEK/JAEA, Ibaraki-Ken
  • I. Sugai
    KEK, Ibaraki
 
 

The hybrid type thick boron-doped carbon (HBC) stripping foils are installed and used for the beam injection at the 3GeV RCS (Rapid Cycling Synchrotron) in J-PARC (Japan Proton Accelerator Research Complex). The HBC foils are developed by Sugai group in KEK, which improved the lifetime drastically. Up to now, the performance deterioration of the stripping foils can not be seen after the long beam irradiation for the 120kW user operation and 300kW high power beam demonstration at the RCS. In order to examine the characteristic of the HBC foils, various beam studies were carried out. The beam-irradiated spot at the foil was measured by scanning the foil setting position, the charge exchange efficiency was evaluated with various thickness foils, and the effect of the SiC fibers supporting the foil mounting was checked with different mounting foils. Beam study results obtained with using the HBC foils will be presented. In addition, the trends of outgas from the stripping foils and the deformations of the foils during the beam irradiation will be reported.