A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Harder, D.A.

Paper Title Page
WEPD049 Progress on Insertion Device Related Activities at the NSLS-II and its Future Plans 3204
 
  • T. Tanabe, O.V. Chubar, T.M. Corwin, D.A. Harder, P. He, G. Rakowsky, J. Rank, C.J. Spataro
    BNL, Upton, Long Island, New York
 
 

National Synchrotron Light Source-II (NSLS-II) project is now in the construction stage. A new insertion device (ID) magnetic measurement facility (MMF) is being set up at Brookhaven National Laboratory in order to satisfy the stringent requirement on the magnetic field measurement of IDs. ISO-Class7 temperature stabilized clean room is being constructed for this purpose. A state-of-the-art Hall probe bench and integrated field measurement system will be installed therein. IDs in the project baseline scope include six damping wigglers, two elliptically polarizing undulators (EPUs), three 3.0m long in-vacuum undulators (IVUs) and one 1.5m long IVU. Three-pole wigglers with peak field over 1 Tesla will be utilized to accommodate the users of bending magnet radiation at the NSLS. Future plan includes: 1) an in-vacuum magnetic measurement system, 2) use of PrFeB magnet for improved cryo undulator, 3) development of advanced optimization program for sorting and shimming of IDs, 4) development of a closed loop He gas refrigerator, 5) switchable quasi-periodic EPU. Design features of the baseline devices, IDMMF and the future plans for NSLS-II ID activities are described.