A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Gallardo, J.C.

Paper Title Page
WEPE074 A Possible Hybrid Cooling Channel for a Neutrino Factory 3515
 
  • M.S. Zisman
    LBNL, Berkeley, California
  • J.C. Gallardo
    BNL, Upton, Long Island, New York
 
 

A Neutrino Factory requires an intense and highly cooled (in transverse phase space) muon beam. We discuss a hybrid approach for a linear 4D cooling channel consisting of high-pressure gas-filled RF cavities –potentially allowing high gradients without breakdowns– and discrete LiH absorbers to provide the necessary energy loss that results in the needed muon beam cooling. We report simulations of the channel performance and its comparison with the vacuum case; we also discuss the various technical and safety issues associated with cavities filled with high-pressure hydrogen gas. Even with additional windows that might be needed for safety reasons, the channel performance is comparable to that of the original, all-vacuum Feasibility Study 2a channel on which our design is based. If tests demonstrate that the gas-filled RF cavities can operate properly with an intense beam of ionizing particles passing through them, our approach would be an attractive way of avoiding possible breakdown problems with a vacuum RF channel.