A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Fukui, T.

Paper Title Page
TUPEC007 Construction of Injector System for SPring-8 X-FEL 1722
 
  • H. Hanaki, T. Asaka, H. Ego, H. Kimura, T. Kobayashi, S. Suzuki, M. Yamaga
    JASRI/SPring-8, Hyogo-ken
  • T. Fukui, T. Inagaki, N. Kumagai, Y. Otake, T. Shintake, K. Togawa
    RIKEN/SPring-8, Hyogo
 
 

The injector of the 8 GeV linac generates an electron beam of 1 nC, accelerates it up to 30 MeV, and compresses its bunch length down to 20 ps. Even slight RF instability in its multi-stage bunching section fluctuates the bunch width and the peak current of an electron beam and it accordingly results in unstable laser oscillation in the undulator section. The acceptable instabilities of the RF fields in the cavities, which permit 10% rms variation of the peak beam current, are only about 0.01% rms in amplitude and 120 fs rms in phase according to beam simulation. The long-term RF variations can be compensated by feedback control of the RF amplitude and phase, the short-term or pulse-to-pulse variations, however, have to be reduced as much as possible by improving RF equipment such as amplifiers. Thus we have carefully designed and manufactured the RF cavities, amplifiers and control systems, giving the highest priority to the stabilization of the short-term variations. Components of the injector will be completed by the end of the April 2010, and the injector will be perfected in the summer 2010. We will present the performance of the completed devices in the conference.

 
WEPEB060 System Design of Accelerator Safety Interlock for the XFEL/SPring-8 2827
 
  • M. Kago, T. Matsushita, N. Nariyama, C. Saji, R. Tanaka, A. Yamashita
    JASRI/SPring-8, Hyogo-ken
  • Y. Asano, T. Fukui, T. Itoga
    RIKEN/SPring-8, Hyogo
 
 

The accelerator safety interlock system (ASIS) for the XFEL/SPring-8 protects personnel from radiation hazard. We designed the ASIS consisting of three independent systems; a central interlock system, an emergency interlock system and a beam route interlock system. The central interlock system monitors the machine tunnel security, status of beam line interlock system and radiation monitoring system. The emergency interlock system monitors status of emergency stop buttons. The beam route interlock system monitors electron beam route by inputting the current of the bending magnets at the electron-beam switching points. If any system trips, or if any system detects unsafe status, the permission signal for the accelerator operation from the system is off and the electron beam is inhibited. In addition, it is demanded that the permission signals must be transmitted within 16.6 ms. Therefore, the stability and fast response are required for the XFEL safety interlock system. We adopted programmable logic controllers (PLC) for the stability, and developed optical modules for the fast signal transmission. This paper describes system design of the ASIS.