Fuchsberger, K.

Paper Title Page
MOPEC003 Operational Experience during Initial Beam Commissioning of the LHC 456
 
  • K. Fuchsberger, R. Alemany-Fernandez, G. Arduini, R.W. Assmann, R. Bailey, O.S. Brüning, B. Goddard, V. Kain, M. Lamont, A. Macpherson, M. Meddahi, G. Papotti, M. Pojer, L. Ponce, S. Redaelli, M. Solfaroli Camillocci, W. Venturini Delsolaro, J. Wenninger
    CERN, Geneva
 
 

After the incident on the 19th September 2008 and more than one year without beam the commissioning of the LHC started again on November 20, 2009. Progress was rapid and collisions under stable beam conditions were established at 1.2 TeV within 3 weeks. In 2010 after qualification of the new quench protection system the way to 3.5 TeV was open and collisions were delivered at this energy after a month of additional commissioning. This paper describes the experiences and issues encountered during these first periods of commissioning with beam.

 
MOPEC005 Kick Response Measurements during LHC Injection Tests and Early LHC Beam Commissioning 462
 
  • K. Fuchsberger, S.D. Fartoukh, B. Goddard, V. Kain, M. Meddahi, F. Schmidt, J. Wenninger
    CERN, Geneva
 
 

The transfer lines from the SPS to the LHC, TI2 and TI8, with a total length of almost 6km are the longest ones in the world. For that reason even small systematic optics errors are not negligible because they add up and result in an injection mismatch in the LHC. Next to other lattice measurement methods Kick-response measurements were the most important sources of information during the early phases of beam commissioning of these transfer lines and the LHC ring. This measurement technique was used to verify orbit-corrector and BPM gains as well as to sort out optics errors. Furthermore fits to off-momentum kick response turned out to be an appropriate method to establish a model for systematic errors of the transfer line magnets. This paper shortly describes the tools and methods developed for the analysis of the taken data and presents the most important results of the analysis.

 
MOPEC006 JMAD - Integration of MADX into the JAVA World 465
 
  • K. Fuchsberger, V. Baggiolini, R. Gorbonosov, W. Herr, V. Kain, G.J. Müller, S. Redaelli, F. Schmidt, J. Wenninger
    CERN, Geneva
 
 

MADX (Methodical Accelerator Design) is the de-facto standard software for modeling accelerator lattices at CERN. This feature-rich software package is implemented and maintained in the programming languages C and FORTRAN. Nevertheless the controls environment of modern accelerators at CERN, e.g. of the LHC, is dominated by JAVA applications. A lot of these applications, for example for lattice measurement and fitting, require a close interaction with the numerical models, which are all defined by the use of the proprietary MADX scripting language. To close this gap an API to MADX for the JAVA programming language (JMAD) was developed. Already the current implementation provides access to a large subset of the MADX capabilities (e.g. twiss-calculations, matching or querying and setting arbitrary model parameters) without any necessity to define the models in yet another environment. This paper describes shortly the design of this project as well as the current status and some usage examples.

 
MOPEC007 Operational Experience during the LHC Injection Tests 468
 
  • K. Fuchsberger, R. Alemany-Fernandez, G. Arduini, R.W. Assmann, R. Bailey, O.S. Brüning, B. Goddard, V. Kain, M. Lamont, A. Macpherson, M. Meddahi, G. Papotti, M. Pojer, L. Ponce, S. Redaelli, M. Solfaroli Camillocci, W. Venturini Delsolaro, J. Wenninger
    CERN, Geneva
 
 

Following the LHC injection tests of 2008, two injection tests took place in October and November 2009 as preparation for the LHC restart on November 20, 2009. During these injection tests beam was injected through the TI2 transfer line into sector 23 of ring 1 and through TI8 into the sectors 78, 67 and 56 of ring 2. The beam time was dedicated to injection steering, optics measurements and debugging of all the systems involved. Because many potential problems were sorted out in advance, these tests contributed to the rapid progress after the restart. This paper describes the experiences and issues encountered during these tests as well as related measurement results.

 
MOPEC011 The Online Model for the Large Hadron Collider 480
 
  • S. Redaelli, M.C. Alabau Pons, K. Fuchsberger, M. Giovannozzi, M. Lamont, G.J. Müller, F. Schmidt
    CERN, Geneva
  • X. Buffat
    EPFL, Lausanne
 
 

The control of the high intensity beams of the CERN Large Hadron Collider (LHC) is particular challenging and requires a precise knowledge of the critical beam and machine parameters. In recent years efforts were devoted to the design of a software infrastructure aimed at mimicking the behavior of the LHC. An online model of the machine, based on the accelerator design tool MADX, has been developed to support the commissioning and the operation of the LHC. This model is integrated into the JAVA-based LHC software framework and provides the full computing power of MADX, including the best knowledge of the machine aperture and magnetic models. The MADX implementation is server-based and provides various facilities for optics computation to other application clients. In this paper, we present the status of the MADX online application and illustrate how it has been used during the LHC commissioning. Possible future implementations are also discussed.

 
TUPEB065 Phase-dependant Coupling at Injection from Tilt Mismatch between the LHC and its Transfer Lines 1668
 
  • V. Kain, K. Fuchsberger, B. Goddard, D. Karadeniz, M. Meddahi, J. Wenninger
    CERN, Geneva
 
 

The tilt mismatch between the LHC and its transfer lines arises from the use of combined horizontal and vertical bends. The mismatch gives rise to several subtle optical effects, including a coupling at injection into the LHC which depends on the phase of the oscillation amplitude at the injection point. This coupling was observed for the first time in 2008, and in 2009 dedicated measurements were made. The results are described and compared with the expectations, and the operational implications detailed.

 
TUPEB069 Results of 2009 Optics Studies of the SPS to LHC Transfer Lines 1680
 
  • M. Meddahi, S.D. Fartoukh, K. Fuchsberger, B. Goddard, W. Herr, V. Kain, V. Mertens, J. Wenninger
    CERN, Geneva
  • D. Kaltchev
    TRIUMF, Vancouver
 
 

In 2008, the SPS-to-LHC transfer line operation allowed for the first time to perform beam measurements in the last part of the lines and into the LHC. Beam parameters were measured and compared with expectation. Discrepancies were observed in the dispersion matching into the LHC, and also in the vertical phase advance along the line. In 2009, extensive theoretical and simulation work was performed in order to understand the possible sources of these discrepancies. This allowed establishing an updated model of the beam line, taking into account the importance of the full magnetic model, the limited dipole corrector strengths and the precise alignment of beam elements. During 2009, beam time was allocated in order to perform further measurements, checking and refining the optical model of the transfer line and LHC injection region and validating the different assumptions. Results of the 2009 optics measurements and comparison with the beam specification and model are presented.