WEPEA013 | Operation and Upgrade of the ESRF Synchrotron Light Source. | 2502 |
|
||
After 15 years of highly successful user operation, the Council of the ESRF are funding an ambitious 7 year upgrade programme (2009-2015) of the European Synchrotron Radiation Facility. In this context the accelerator complex will benefit from a number of upgrades. Several insertion device straight sections will be lengthened from five to six meters. The beamline scientific capacities will be increased by operating some straight sections in the canting geometry. New insertion devices will be built to fulfill the requirements of the scientific programme. The RF system also faces a major reconstruction with the replacement of some klystron based transmitters by high power solid state amplifiers and the development of HOM damped cavities operating at room temperature. The orbit stabilisation system system will be renovated. This paper reports on the present operation performances of the source, highlighting the recent development, as well as the advancement of the upgrade projects. |
||
THPE081 | First Results of Space Charge Simulations for the Novel Multi-turn Injection | 4710 |
|
||
Recently, a novel multi-turn injection technique was proposed. It is based on beam merging via resonance crossing. The various beamlets are successively injected and merged back by crossing a stable resonance generated by non-linear magnetic fields. Space charge is usually a crucial effect at injection in a circular machine and it could have an adverse impact on the phase space topology required for merging the various beamlets. Numerical simulations were performed to assess the stability of the merging process as a function of injected beam charge. The results are presented and discussed in this paper. |
||
THOBMH02 | Results from the 2009 Beam Commissioning of the CERN Multi-turn Extraction | 3619 |
|
||
Following the analysis of the results obtained during the first year of beam commissioning of the CERN multi-turn extraction, a number of changes have been introduced in the beam manipulations performed in the CERN Proton Synchrotron. This includes a different control of the linear chromaticity, the setting of the non-linear magnets used to split the beam, and the longitudinal structure in the PS. The results obtained during the 2009 run are presented and discussed in detail, including the beam performance in both the PS and the SPS, as well as the optics measurements in the transfer line between the two circular machines. |
||
|