A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Facco, A.

Paper Title Page
MOPEC056 The Accelerator Prototype of the IFMIF/EVEDA Project 588
 
  • A. Mosnier, P.-Y. Beauvais, R. Gobin, J.-F. Gournay, P. Joyer, J. Marroncle, P.A.P. Nghiem, F. Orsini
    CEA, Gif-sur-Yvette
  • B. Brañas, A. Ibarra, P. Méndez, I. Podadera Aliseda, J. Sanz, F. Toral
    CIEMAT, Madrid
  • M. Comunian, A. Facco, A. Palmieri, A. Pepato, A. Pisent
    INFN/LNL, Legnaro (PD)
  • P. Garin, Ch. Vermare
    IFMIF/EVEDA, Rokkasho
  • R. Heidinger
    Fusion for Energy, Garching
  • H. Kimura, T. Kojima, T. Kubo, S. Maebara, S. O'hira, Y. Okumura, K. Shinto, H. Takahashi, K. Yonemoto
    JAEA, Aomori
 
 

The ob­jec­tives of the IFMIF/EVEDA pro­ject are to pro­duce the de­tailed de­sign of the en­tire IFMIF fa­cil­i­ty, as well as to build and test a num­ber of pro­to­types, in­clud­ing a high-in­ten­si­ty CW deuteron ac­cel­er­a­tor (125 mA @ 9 MeV). Most of the ac­cel­er­a­tor com­po­nents (In­jec­tor, RFQ, Su­per­con­duct­ing RF-Linac, Trans­port Line and Beam Dump, RF Sys­tems, Local con­trol sys­tems, beam in­stru­men­ta­tion) are de­signed and pro­vid­ed by Eu­ro­pean in­sti­tu­tions (CEA/Saclay, CIEMAT, INFN/LNL, SCK-CEN), while the RFQ cou­plers, the su­per­vi­sion of the con­trol sys­tem and the build­ing in­clud­ing util­i­ties con­struct­ed at Rokkasho BA site are pro­vid­ed by JAEA. The co­or­di­na­tion be­tween Eu­rope and Japan is en­sured by an in­ter­na­tion­al pro­ject team, lo­cat­ed in Rokkasho, where the ac­cel­er­a­tor will be in­stalled and com­mis­sioned. The de­sign and R&D ac­tiv­i­ties are pre­sent­ed, as well as the sched­ule of the pro­to­type ac­cel­er­a­tor.

 
MOPD042 Commissionning of the IFMIF/EVEDA Accelerator Prototype – Objectives & Plans 777
 
  • Ch. Vermare, P. Garin, H. Shidara
    IFMIF/EVEDA, Rokkasho
  • P.-Y. Beauvais, A. Mosnier
    CEA, Gif-sur-Yvette
  • A. Facco, A. Pisent
    INFN/LNL, Legnaro (PD)
  • R. Heidinger
    Fusion for Energy, Garching
  • A. Ibarra
    CIEMAT, Madrid
  • H. Kimura, S. Maebara, S. O'hira, Y. Okumura, K. Shinto, H. Takahashi
    JAEA, Ibaraki-ken
 
 

In the frame of the IFMIF/EVEDA pro­ject, a high-in­ten­si­ty (125 mA) CW deuteron ac­cel­er­a­tor will be in­stalled and com­mis­sioned at the Rokkasho's Broad­er Ap­proach (BA) site. The main ob­jec­tive of this 9 MeV pro­to­type is to pro­vide in­for­ma­tion on the fea­si­bil­i­ty of the de­sign, the man­u­fac­tur­ing and the op­er­a­tion of the two linacs (up to 40 MeV) fore­seen for IFMIF*. Based on the re­quire­ments for each Sys­tem (Ac­cel­er­a­tors, Lithi­um tar­get and Tests Fa­cil­i­ty) which are de­duced from the IFMIF fu­sion ma­te­ri­al ir­ra­di­a­tion re­quire­ments, given by the users, the ob­jec­tives of this ac­cel­er­a­tor pro­to­type are de­fined and pre­sent­ed here. Also, be­cause of the dis­tribut­ed na­ture of the de­sign work and the pro­cure­ment of the ac­cel­er­a­tor, or­ga­ni­za­tion of the in­stal­la­tion and com­mis­sion­ing phase is es­sen­tial. The in­stal­la­tion and com­mis­sion­ing schemes, the or­ga­ni­za­tion pro­posed and the over­all plans are pre­sent­ed.


*IFMIF International Team, IFMIF Comprehensive Design Report (CDR) 2003.