Einfeld, D.

Paper Title Page
WEIRA03 Experience of Academia-industry Collaboration on Accelerator Projects in Europe 2452
 
  • D. Einfeld
    CELLS-ALBA Synchrotron, Cerdanyola del Vallès
 
 

European industry has participated in the LHC Project for technology development, component design and system construction. A good relationship in academia-industry collaboration has led to successful results for the project. Industry plays an important role for component design, manufacture and system construction in the XFEL project. The long history of academia-industry collaboration in the accelerator field in Europe is presented.

 

slides icon

Slides

 
WEPEA054 Status of the ALBA project 2606
 
  • D. Einfeld
    CELLS-ALBA Synchrotron, Cerdanyola del Vallès
 
 

The Synchrotron Light source ALBA is entering the commissioning period and beam should be provided to the users by the end of 2010. The installation of the full energy 3 GeV booster is finished, with the commissioning taking place in January 2010. The installation of the storage ring is almost finished and the commissioning should take place in summer 2010. The detailed milestones of the project are presented.

 
WEPEA055 General description of IDs initially installed at ALBA 2609
 
  • J. Campmany, D. Einfeld, J. Marcos, V. Massana
    CELLS-ALBA Synchrotron, Cerdanyola del Vallès
 
 

The new 3rd generation synchrotron radiation source ALBA built nearby Barcelona is planned to start operation in 2010 with several different insertion devices installed in the storage ring either from the beginning or within the first year of operation. The list of first insertion devices includes: 2 planar PPM SmCo in-vacuum undulators with the period of 21.6 mm; 2 Apple-II type PPM NdFeB undulators with the periods of 62.36 and 71.36 mm respectively; 1 superconducting planar wiggler with the period of 30 mm and a maximum field of 2.1 T, and a 1 conventional wiggler with the period of 80.0 mm and a maximum field of 1.74 T. The emitted light of these IDs covers wide spectral range extending from hard X-rays to UV. Pre-design of the IDs was done by ALBA, but manufacturing has been outsourced. Production is now finished and they have been tested with magnetic measurements. The paper will present the final as build magnetic designs as well as the main results of magnetic measurements performed on the manufactured devices.

 
WEPEA056 Beam Optics Measurements During the Commissioning of the ALBA Booster 2612
 
  • G. Benedetti, D. Einfeld, Z. Martí, M. Muñoz
    CELLS-ALBA Synchrotron, Cerdanyola del Vallès
 
 

The commissioning of the booster for the synchrotron light source ALBA should take place in the period December 2009-January 2010. In this paper, the beam dynamics aspects of the commissioning are described, including the studies performed, the main problems find during the commissioning and a comparison of the measured beam parameters to the design one. A description of the software tools used and developed for the task is included.

 
THPEA083 The ALBA Vacuum System: Installation and Commissioning 3861
 
  • E. Al-Dmour, D. Einfeld
    CELLS-ALBA Synchrotron, Cerdanyola del Vallès
 
 

The mechanical installation of the booster synchrotron of ALBA started in January 2009 and finished by having the system under vacuum in April 2009. The preparation of the booster vacuum system for the installation (partial assembly with the pumps and instrumentation, bakeout, etc) started already in September 2008. For the storage ring, the main mechanical installation was done from May to September 2009. The average pressure in the booster synchrotron is in the range of low 10-9 mbar and in the storage ring is in the low 10-10 mbar. The preparation of the installation, the installation and the present performance will be presented in this contribution. The first round of the booster commissioning took place at the end of 2009 and the beginning of 2010. The first data of the booster vacuum system commissioning are presented as well.

 
THPE076 Effect of the Phase One Insertion Devices in the ALBA Storage Ring 4695
 
  • Z. Martí, G. Benedetti, D. Einfeld, M. Muñoz
    CELLS-ALBA Synchrotron, Cerdanyola del Vallès
 
 

The synchrotron light source ALBA incorporates 6 insertion devices (2 Apple-II type undulators, 2 plannar in-vacuum undulators, 1 normal conducting multipole wiggler and 1 superconduction multipole wiggler) at the start of operation. The effect of the different IDs in the performance of the facility is evaluated, using several methods (kick maps, hard edge models, dynamic multipoles, …), including a comparison of the agreement of the different models and simulation codes. According to the results, and due mainly to the influence of the superconducting wiggler, a new working point has been selected.

 
THPE077 Predicted Effect of the Measured High Order Magnetic Multipole in the ALBA Storage Ring 4698
 
  • M. Muñoz, G. Benedetti, D. Einfeld, Z. Martí
    CELLS-ALBA Synchrotron, Cerdanyola del Vallès
 
 

The high order magnetic multipole components of all the magnets in the ALBA storage ring have been measured. Previous studies have simulated the effects of the HOMs using statistic methods. The magnets have been installed now in the tunnel, allowing for a better simulation of the future impact of the HOMs in the performance of the light source. In this paper, the effect of the high order multipoles of the dipole, quadrupole and sextupole magnets in the dynamic aperture and the Touschek lifetime are reviewed.