Paper | Title | Page |
---|---|---|
WEPD072 | Conductive EMI Test of Magnet Power Supply in NSRRC | 3266 |
|
||
The purpose of this paper is to estimate the conductive Electromagnetic Interference (EMI) from magnet power supply in NSRRC. A LISN system was conducted to measure the EMI spectrum of power supply. The different frequency range of conductive EMI was measured. For the future TPS(Taiwan Photon Source) power supply design, the EMI signals must be lower than TLS kicker. Therefore reducing and eliminating the interference of electromagnetic waves will be a very important issue. A filter and shielding method were used to test the effects of reducing EMI. The EMI prevention scheme will be used in the future. |
||
THPEB074 | Utility System Design and Construction Status for the 3 GeV TPS Storage Ring | 4038 |
|
||
The design of the utility system for the 3.0 GeV Taiwan Photon Source (TPS) has been finished and the construction engineering has been contracted out in the end of 2009. This paper presents the TPS utility system, including the electrical power, cooling water and air conditioning system, which were designed to meet requirements of high reliability and stability. The TPS construction site is located adjacent to TLS. Even some areas of TPS and TLS are overlapped. The whole utility system construction will be finished in the end of 2012. Therefore, the construction engineering of the TPS utility system is a challenge to finish on a tight schedule and keep the TLS in operation during the construction. Some management schemes of the construction engineering are also presented in this paper. |
||
THPEB075 | Numerical Simulation and Air Conditioning System Study for the Storage Ring of TLS | 4041 |
|
||
The stability of air temperature in the storage ring tunnel is one of the most critical factors. Therefore, a series of air conditioning system upgrade studies and projects have been conducted at the Taiwan Light Source (TLS). The global air temperature variation related to time in the storage ring tunnel has been controlled within ±0.1 degree C for years. This study is aimed at more precise temperature control. Some temperature control schemes are applied on this study. We also performed computational fluid dynamics (CFD) to simulate the flow field and the spatial temperature distribution in the storage ring tunnel. |
||
THPEB076 | Utility Cooling System Design for the Taiwan Photon Source | 4044 |
|
||
National Synchrotron Radiation Research Center (NSRRC) in Taiwan has finished an open bid about utility system for Taiwan photon source (TPS). The detail design and criteria of the utility cooling system, including cooling water and air conditioning system, have also been considered and confirmed. From controls to facility, all devices were designed and optimized to meet critical requirements of high reliability and stability. Besides, the paper mainly focuses on thermal load evaluation and removes to achieve the best efficiency and performance of system. The brand new system structure and control strategy also be realized. |
||
THPEB077 | Simulation and Design of the High Precision Temperature Control for the De-ionized Cooling Water System | 4047 |
|
||
Previously, the Taiwan Light Source (TLS) has proven that the temperature stability of de-ionized cooling water is one of the most critical factors of electron beam stability. A series of efforts were devoted to these studies and promoted the temperature stability of the de-ionized cooling water system within ±0.1°C. Further, a high precision temperature control ±0.01°C has been conducted to meet the more critical stability requirement. Using flow mixing mechanism and specified control philosophy can minimize temperature variation effectively. The paper declares the mechanism through simulation and verifies the practical influences. The significant improvement of temperature stability between cooling devices and de-ionized water are also presented. |
||
THPEB078 | Investigation and Analysis of TLS Electric Power System Harmonics | 4050 |
|
||
The electric power system of Taiwan Photon Source (TPS) will be installed during the construction of TPS. Many power electronic devices which produce large nonlinear loads will be used in the new power system and the accelerator facility. The capacitor banks will also be used for the power factor correction. Thus, the excessive harmonic waveform distortion level on the normal waveform will be presented continuously. These excessive harmonic current flows will result in transformer and cable over-heating and many types of circuit faults, and also wasting energy. A project is initiated to study these harmonic effects which will appear in the electric power system of TPS. A computer simulation approach is used to study the harmonic waveform distortion phenomena, and also to investigate an effective approach to reduce it. The harmonic effects of selected section of TLS (Taiwan Light Source) electric power system, and those appear at the mock segment of 1/24 accelerator of TPS system are measured and compared with the simulated results. |