A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Blednykh, A.

Paper Title Page
TUPEC045 Requirements on the Pulsed Magnets for the Best Injector Performance 1823
 
  • T.V. Shaftan, A. Blednykh, Y. Kawashima, S. Krinsky, J. Rose, L.-H. Yu
    BNL, Upton, Long Island, New York
 
 

Booster extraction presents a number of problems that include strengths and waveforms of the pulsed magnets and design of the vacuum chamber. Instabilities in the booster extraction may compromise the extracted beam quality deteriorating value of high-performance injector design. Here we discuss requirements and tolerances for the extraction system components and methods of increasing its performance.

 
TUPD084 High Current Limitations for the NSLS-II Booster 2108
 
  • A. Blednykh, W.X. Cheng, R.P. Fliller, Y. Kawashima, J. Rose, T.V. Shaftan, L.-H. Yu
    BNL, Upton, Long Island, New York
 
 

In this paper, we present an overview of the impact of collective effects upon the performance of the NSLS-II booster.

 
WEPEA082 Status of the NSLS-II Injection System Development 2672
 
  • T.V. Shaftan, A. Blednykh, W.R. Casey, L.R. Dalesio, R. Faussete, M.J. Ferreira, R.P. Fliller, G.S. Fries, G. Ganetis, W. Guo, R. Heese, H.-C. Hseuh, Y. Hu, P.K. Job, E.D. Johnson, Y. Kawashima, B.N. Kosciuk, S. Kowalski, S. Krinsky, Y. Li, H. Ma, R. Meier, S. Ozaki, D. Padrazo, B. Parker, I. Pinayev, M. Rehak, J. Rose, S. Sharma, O. Singh, P. Singh, J. Skaritka, C.J. Spataro, G.M. Wang, F.J. Willeke, L.-H. Yu
    BNL, Upton, Long Island, New York
 
 

We discuss status and plans of development of the NSLS-II injector. The injector consists of 200 MeV linac, 3-GeV booster, transport lines and injection straight section. The system design is now nearly completed and the injector development is in the procurement phase. The injector commissioning is planned to take place in 2012.