Paper | Title | Page |
---|---|---|
MOPEA028 | Lattice Design for the ERL Electron Ion Collider in RHIC | 127 |
|
||
We present a medium-energy (4 GeV) electron ion collider (MeRHIC) lattice design for the Relativistic Heavy Ion Collider (RHIC). MeRHIC represents a staged approach towards the higher energy eRHIC, with MeRHIC hardware being reused for eRHIC. The lattice design includes two Energy Recovery Linacs (ERLs), multiple isochronous arcs connected to the ERLs, an interaction region design, a low energy ERL with a polarized electron source, and connecting beam lines. * V. Litvinenko, proceedings from this conference. |
||
MOPEC023 | RHIC Performance for FY10 200 GeV Au+Au Heavy Ion Run | 507 |
|
||
Since the last successful RHIC Au+Au run in 2007 (Run7), the RHIC experiments have made numerous detector improvements and upgrades. In order to benefit from the enhanced detector capabilities and to increase the yield of rare events in the acquired heavy ion data a significant increase in luminosity is essential. In Run7 RHIC achieved an average store luminosity of <L>=12x1026 cm-2 s-1 by operating with 103 bunches (out of 110 possible), and by squeezing to β*=0.8 m. Our goal for this year's run, Run10, was to achieve an average of <L>=27x1026 cm-2 s-1. The measures taken were decreasing β* to 0.6 m, and reducing longitudinal and transverse emittances by means of bunched-beam stochastic cooling. In addition we introduced a lattice to suppress intra-beam scattering (IBS) in both RHIC rings, upgraded the RF system, and separated transition crossings in both rings while ramping. We present an overview of the changes and the results in terms of Run10 increased instantaneous luminosity, luminosity lifetime, and integrated luminosity. |
||
MOPEC033 | RHIC Performance as a 100 GeV Polarized Proton Collider in Run-9 | 531 |
|
||
During the second half of Run-9, the Relativistic Heavy Ion Collider (RHIC) provided polarized proton collisions at two interaction points with both longitudinal and vertical spin direction. Despite an increase in the peak luminosity by up to 40%, the average store luminosity did not increase compared to previous runs. We discuss the luminosity limitations and polarization performance during Run-9. |
||
THPE099 | RHIC Proton Beam Lifetime Increase with 10- and 12-pole Correctors | 4752 |
|
||
The RHIC beam lifetime in polarized proton operation is dominated by the beam-beam effect, parameter modulations, and nonlinear magnet errors in the interaction region magnets. Sextupole and skew sextupole errors have been corrected deterministically for a number of years based on tune shift measurements with orbit bumps in the triplets. During the most recent polarized proton run 10- and 12-pole correctors were set through an iterative procedure, and used for the first time operationally in one of the beams. We report on the procedure to set these high-order multipole correctors and estimate their effect on the integrated luminosity. |