A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Akiyama, A.

Paper Title Page
TUPEA048 Low Level RF System for cERL 1440
 
  • T. Miura, A. Akiyama, D.A. Arakawa, S. Fukuda, H. Katagiri, T. Matsumoto, S. Michizono, J.-I. Odagiri, Y. Yano
    KEK, Ibaraki
 
 

The compact ERL(cERL) is the energy recovery linac(ERL) test facility that is under construction at KEK. The stability of accelerating electric field of 0.1% rms in amplitude and 0.1deg. in phase is required for LLRF system. The status of LLRF system for cERL will be reported.

 
WEPEB002 Prototype of the Ethernet-based Power Supply Interface Controller Module for KEKB 2683
 
  • T.T. Nakamura, A. Akiyama, K. Furukawa
    KEK, Ibaraki
 
 

Most of the magnet power supplies of the KEKB rings and beam transport lines are connected to the local control computers through ARCNET. For this purpose we have developed the Power Supply Interface Controller Module (PSICM), which is designed to be plugged into the power supply. It has a 16-bit microprocessor, ARCNET interface, trigger pulse input interface, and parallel interface to the power supply. According to the upgrade plan of the KEKB accelerators, more power supplies are expected to be installed. Although the PSICMs have worked without serious problem for 11 years, it seems too hard to keep maintenance for the next decade because some of the parts have been discontinued. Thus we decided to develop the next generation of the PSICM. Its major change is the use of the Ethernet instead of the ARCNET. On the other hand the specifications of the interface to the power supply are not changed at all. The new PSICM is named ePSICM (Ethernet-based Power Supply Interface Controller Module). The design of the ePSICM and the development of the prototype modules are in progress.

 
WEPD060 Update of Main Magnet Power Supplies at Pf-Ar 3233
 
  • T. Ozaki, A. Akiyama, K. Harada, T. Kasuga, Y. Kobayashi, T. Miyajima, S. Nagahashi, T.T. Nakamura, M. Ono, T. Sueno
    KEK, Ibaraki
 
 

At PF-AR, a bending magnet power supply was updated in 2007. The converter works in the 3 pulsed PWM. A trouble caused by higher harmonics above 40th had occurred. We manufactured filters and installed in 6.6kV ac lines in 2008. Furthermore, a QF magnet power supply was updated in 2009. This paper reports on the update of PF-AR main magnet power supplies.

 
THPEB022 Beam Spill Control for the J-PARC Slow Extraction 3933
 
  • A. Kiyomichi, T. Adachi, A. Akiyama, S. Murasugi, R. Muto, H. Nakagawa, J.-I. Odagiri, K. Okamura, H. Sato, Y. Sato, S. Sawada, H. Someya, K.H. Tanaka, M. Tomizawa, A. Toyoda
    KEK, Tsukuba
  • T. Kimura
    Miyazaki University, Miyazaki
  • K. Mochiki, S. Onuma
    Tokyo City University, Tokyo
  • K. Noda
    NIRS, Chiba-shi
 
 

The slow extraction beam from the J-PARC Main Ring (MR) to the Hadron Experimental Facility is used in various nuclear and particle physics experiments. A flat structure and low ripple noise are required for the spills of the slow extraction. The spill control system has been developed for the J-PARC slow extraction to make a flat structure and small ripple. It consists of the extraction quadrupole magnets and feedback device. The extraction magnets consist of two kinds of quadrupole magnets, EQ (Extraction Q-magnet) which make flat beam and RQ (Ripple Q-magnet) which reject the high frequent ripple noise. The feedback system, which is using Digital Signal Processor (DSP), makes a ramping pattern for EQ and RQ from spill beam monitor. The extraction magnets and feedback device were installed in September 2009, and spill feedback study were successfully started from the beam time in October 2009. Here we report the operation status of magnets and first study of beam commissioning with spill feedback.