Paper | Title | Page |
---|---|---|
MOOCMH02 | Overview of Short Pulse X-ray Generation using Crab Cavities at SPring-8 | 39 |
|
||
We have been developing a system to generate a short pulse X-ray using crab cavities at SPring-8 Storage Ring. The ring holds 30-m long straight sections and the vertical beam size at the center of the straight sections is 6.5 micrometers in standard deviation. If we install four superconducting crab cavities and a mini-pole undulator in one of the straight sections, we can convert the time distribution of the electron bunch into the spatial distribution. After slicing the emitted photons with vertical slits, we can obtain a sub-picosecond X-ray pulse. In this scheme, the maximum repetition rate of the short pulse X-ray is the same as the acceleration frequency of the ring (508MHz) and user experiments at other beam-lines are not disturbed by this short pulse generation. We are planning to install KEKB type crab cavities as vertical deflectors. Phase fluctuation among crab cavities must be reduced less than 14 mdeg in order to avoid residual deflection in the vertical direction. In this paper, we report an overview of the short pulse generation scheme and topics of hardware development for stabilization of the RF phase fluctuation. |
||
|
||
MOOCMH03 | Beam Commissioning Status of Superconducting Crab Cavities in KEKB | 42 |
|
||
Two superconducting crab cavities have been operated stably without any significant trouble for three years in KEKB since Feb/2007. At present (Dec/2009), maximum beam current with 'Crab ON' achieves 1200mA for HER (High Energy Ring, electron) and 1640mA for LER (Low Energy Ring, positron), respectively. RF trip rate per day due to crab cavity during 'physics run' was 2.8/day for HER and 0.4/day for LER at the beginning, and is 0.8/day for HER and 0.1/day for LER at present, respectively. Although Piezo actuator was frequently broken down at the beam abort with RF trip of the crab cavity, it was controlled stably by only LLRF (Low Level RF) feed-back system without Piezo actuator. Maximum HOM (Higher Order Mode) power, which is measured at HOM dampers made from ferrite, is 9.1kW for HER and 14.6kW for LER at the maximum beam current, respectively. LER crab voltage, which had suddenly dropped from 1.50MV to 1.10MV on March/2007, was gradually recovered from 1.14MV to 1.33MV in 2008. |
||
|
||
TUPEB011 | KEKB Superconducting Accelerating Cavities and Beam Studies for Super-KEKB | 1536 |
|
||
Eight superconducting accelerating cavities have been stably operated in the KEKB with sufficiently low trip rates. Two superconducting crab cavities were installed in 2007 and soon the crab crossing operation started. Recently the KEKB luminosity reached the world record of 2.1 x 1034 cm-1s-1. Stable operations of the accelerating cavities contributed for the luminosity increase. For the future Super-KEKB, we are developing a high power coupler for an input power of 600 kW and a HOM damper for RF power absorption more than 30 kW. The Super-KEKB requires RF operations with the high beam loading and the low RF voltage than the present KEKB operation. To suppress klystron output powers the external Q value has to be reduced. A new operation was proposed for superconducting cavities. In order to keep high RF voltages in each cavity, some cavities reverse its synchronous beam phase while the total RF voltage is kept as low as the required one. Beam studies were successfully carried out with one cavity reversed its synchronous beam phase. |
||
WEOAMH02 | Recent Progress of KEKB | 2372 |
|
||
KEKB is an e-/e+ collider for the study of B physics and is also used for machine studies for future machines. The peak luminosity of KEKB, which is the world-highest value, has been still increasing. This report summarizes recent progress at KEKB. |
||
|
||
WEPEB003 | Fully Embedded EPICS-based Control of Low Level RF System for SuperKEKB | 2686 |
|
||
Gazing at SuperKEKB project, a new control subsystem was designed and implemented to upgrade the low level RF system of the KEKB accelerator based on Experimental and Industrial Control System (EPICS). The new control subsystem comprises a uTCA, a PLC, and an industrial PC. Each card plugged in the uTCA chassis and the PLC function as an embedded Input / Output Controller (IOC) by running the EPICS core program on the Linux operating system. The industrial PC runs Extensible Display Manger on Linux to serve as an Operator Interface (OPI). This paper describes the details of the design and the implementation of the fully embedded EPICS-based low level RF control subsystem for SuperKEKB. |