A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Adumi, N.

Paper Title Page
THPEA009 Construction Status of C-band Main Accelerator for XFEL/SPring-8 3691
 
  • T. Inagaki, N. Adumi, T. Hasegawa, H. Maesaka, S. Matsui, T. Sakurai, T. Shintake
    RIKEN/SPring-8, Hyogo
  • H. Kimura, C. Kondo, K. Shirasawa
    JASRI/SPring-8, Hyogo-ken
 
 

C-band (5712 MHz) accelerator is used as the main accelerator of the XFEL in SPring-8. Since the C-band generates a high accelerator gradient, as high as 35 MV/m, the total length of the 8-GeV accelerator fits within 400 m, including the injector and three bunch compressors. We use 64 C-band rf units, which consists of 128 accelerating structures, 64 rf pulse compressors, 64 klystrons, waveguide components, etc. Mass-production of these high power rf components has been almost completed. Production quality is confirmed by the high power rf test. Installation of the C-band components started in August 2009. So far, about half of the components have been installed on schedule. The accelerating structures are aligned with about 0.1 mm accuracy. By the date of the IPAC'10 conference, we will almost complete the installation. In this presentation, we will report the construction status.