THPEA001 Fabrication and Installation of Radio Frequency System for K500 Superconducting Cyclotron at Kolkata 3673
 
  • M. Ahammed, D. Adak, R.K. Bhandari, P. Bhattacharyya, J. Chaudhuri, M.K. Dey, A. Dutta Gupta, B. Hemram, B.C. Mandal, B. Manna, S. Murmu, H.K. Pandey, S. Saha, S. Sarkar, S.K. Singh, T. Viswanathan
    DAE/VECC, Calcutta
 
 

K500 Superconducting Cyclotron (SCC) is already commissioned successfully at VECC, Kolkata by accelerating Ne3+ internal beam with 70 nA beam current at 670 mm extraction radius. The Radio Frequency cavity of SCC is successfully operational since last two years. All these years were very challenging and worthy period from the point of view of gaining experience and knowledge by solving fabrication and assembly problems faced during construction of 10 m tall copper made coaxial RF cavities and tackling RF related commissioning problems. RF system operates within the frequency range of 9 to 27 MHz for generating maximum 100 kV DEE voltage. The construction of the RF system demands making of numerous critical soldering and brazing joints including joints between ceramic and copper along with maintaining close dimensional accuracies, assembly tolerances, mirror symmetricity, surface finish and utmost cleanliness. This paper presents the details of fabrication and installation procedures and their effects on the final performance of the cavities. It also highlights the problems faced during the commissioning process of the RF cavities.