MOPGF138 Overview and Design Status of the Fast Beam Interlock System at ESS 409
 
  • A. Monera Martinez, R. Andersson, A. Nordt, M. Zaera-Sanz
    ESS, Lund, Sweden
  • C. Hilbes
    ZHAW, Winterthur, Switzerland
 
  The ESS, consisting of a pulsed proton linear accelerator, a rotating spallation target designed for an average beam power of up to 5 MW, and a suite of neutron instruments, requires a large variety of instrumentation, both for controlling as well as protecting the different hardware systems and the beam. The ESS beam power is unprecedented and an uncontrolled release could lead to serious damage of equipment installed along the tunnel and target station within only a few microseconds. Major failures of certain equipment will result in long repair times, because it is delicate and difficult to access and sometimes located in high radiation areas. To optimize the operational efficiency of the facility, accidents should be avoided and interruptions should be rare and limited to a short time. Hence, a sophisticated machine protection system is required. In order to stop efficiently the proton beam production in case of failures, a Fast Beam Interlock (FBI) system with a targeted reaction time of less than 5 microseconds and very high dependability is being designed. The design approach for this FPGA-based interlock system will be presented as well as the status on prototyping.  
poster icon Poster MOPGF138 [2.416 MB]  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUC3O03 Development and Realisation of the ESS Machine Protection Concept 545
 
  • A. Nordt, R. Andersson, T. Korhonen, A. Monera Martinez, M. Zaera-Sanz
    ESS, Lund, Sweden
  • A. Apollonio, R. Schmidt
    CERN, Geneva, Switzerland
  • C. Hilbes
    ZHAW, Winterthur, Switzerland
 
  ESS is facing extremely high beam availability requirements and is largely relying on custom made, very specialised, and expensive equipment for its operation. The proton beam power with an average of 5MW per pulse will be unprecedented and its uncontrolled release can lead to serious damage of the delicate equipment, causing long shutdown periods, inducing high financial losses and, as a main point, interfering drastically with international scientific research programs relying on ESS operation. Implementing a fit-for-purpose machine protection concept is one of the key challenges in order to mitigate these risks. The development and realisation of the measures needed to implement such concept to the correct level in case of a complex facility like the ESS, requires a systematic approach, and will be discussed in this paper.  
slides icon Slides TUC3O03 [11.931 MB]  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
FRB3O02 Status of the European Spallation Source Control System 1177
 
  • T. Korhonen, R. Andersson, F. Bellorini, S.L. Birch, D.P. Brodrick, H. Carling, J. Cereijo García, R.N. Fernandes, L. Fernandez, B. Gallese, S.R. Gysin, E. Laface, N. Levchenko, M. Mansouri Sharifabad, A. Monera Martinez, R. Mudingay, A. Nordt, D. Paulic, D.P. Piso, K. Rathsman, M. Reščič, G. Trahern, M. Zaera-Sanz
    ESS, Lund, Sweden
  • N. Claesson, U. Rojec, K. Strniša, A.A. Söderqvist
    Cosylab, Ljubljana, Slovenia
 
  The European Spallation Source (ESS) is a collaboration of 17 European countries to build the world's most powerful neutron source for research. ESS has entered the construction phase and the plan is to produce first neutrons by 2019 and to complete the construction by 2025. The Integrated Control System Division (ICS) is responsible to provide control systems for the whole facility. The unprecented beam power of 5 MW and the construction of the facility with many components contributed in-kind presents a number of challenges to the control system. Systems have to be specified so that the work can be effectively shared between the contributors and on-site staff. Control system components need to provide a level of performance that can support the operation of the facility, be standardized so that integration to the facility can be done during a short installation period and be maintainable by the in-house staff after the construction has finished. This paper will outline the plans and principles that will be used to construct the control systems. The selected technologies and standards will be presented, as well as the plans for integration.  
slides icon Slides FRB3O02 [1.184 MB]  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)