Paper |
Title |
Page |
MOPGF087 |
TPS Booster Tune Measurement System |
274 |
|
- P.C. Chiu, Y.-S. Cheng, K.T. Hsu, K.H. Hu, C.Y. Liao
NSRRC, Hsinchu, Taiwan
|
|
|
The TPS is a state-of-the-art synchrotron radiation facility featuring ultra-high photon brightness with extremely low emittance. Its Booster has 6 FODO cells which include 7 BD dipoles with 1.6 m long and 2 BH dipoles with 0.8 m long in each cell. After magnetization of stainless steel vacuum chamber of the booster were identified and then dismantled, annealed, and re-installed, the electron beam energy of the Taiwan Photon Source (TPS) in the booster ring has ramped to 3 GeV in a week. The booster tune correction during ramping is one of the main reasons why the booster commissioning progress is so fast. In this paper the summarized the booster tune monitor system will be summarised
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
MOPGF088 |
Integrating the Measuring System of Vibration and Beam Position Monitor to Study the Beam Stability |
277 |
|
- C. H. Huang, Y.-S. Cheng, P.C. Chiu, K.T. Hsu, K.H. Hu, C.Y. Liao
NSRRC, Hsinchu, Taiwan
|
|
|
For a low emittance light source, beam orbit motion needs to be controlled within submicron for obtaining a high quality light. Magnets vibration especially quadruples will be one of the main sources to destroy the beam stability. In order to study the relationship between vibration and beam motion, it is highly desirable to use a synchronous data acquisition system which integrates measurement of vibration and beam position monitor systems especially for the coherence analysis. For a larger vibration such as earthquakes are also deleterious to beam stability or even make the beam trip due to the quench of superconducting RF cavity. A data acquisition system integrated with an earthquake detector is also quite necessary to show and archive the data on the control system. The data acquisition systems of vibration and earthquake measurement system are summarized in this report. The relationship between the beam motion and magnets vibration will also study here.
|
|
|
Poster MOPGF088 [0.504 MB]
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
FRB3O01 |
Commissioning of the TPS Control System |
1173 |
|
- C.Y. Liao, Y.-T. Chang, J. Chen, Y.-S. Cheng, P.C. Chiu, K.T. Hsu, S.Y. Hsu, K.H. Hu, C. H. Huang, C.H. Kuo, D. Lee, C.-J. Wang, C.Y. Wu
NSRRC, Hsinchu, Taiwan
|
|
|
Control system for the Taiwan Photon Source (TPS) has been completed in 2014. Commissioning of the accelerator system is in proceeding. Electron beam were stored at the storage ring and emit first light in December 31, 2014. TPS control system adopts EPICS toolkits as its frameworks. The subsystems control interfaces include event based timing system, Ethernet based power supply control, corrector power supply control, PLC-based pulse magnet power supply control and machine protection system, insertion devices motion control system, various diagnostics related control environment, and etc. The standard hardware components had been installed and integrated, and the various IOCs (Input Output Controller) had been implemented as various subsystems control platforms. Low level and high level hardware and software are tested intensively in 2014 and final revise to prepare for routine operation is under way. Efforts will be summarized at this paper.
|
|
|
Slides FRB3O01 [41.594 MB]
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|