Author: Hsu, K.T.
Paper Title Page
MOPGF008 Embedded Environment with EPICS Support for Control Applications 107
 
  • Y.-S. Cheng, K.T. Hsu, C. H. Huang, D. Lee, C.Y. Liao
    NSRRC, Hsinchu, Taiwan
 
  System on a chip (SoC) is widely used in embedded environment. Current generation SoC commercial products with small footprint and low-cost have powerful in CPU performance and rich interface solution to support many control applications. To deal with some embedded control applications, the "Banana Pi" which is a card-size single-board computer and runs Linux-based operation system has been adopted as the EPICS IOC to implement several applications. The efforts for implementing are summarized in this paper.  
poster icon Poster MOPGF008 [2.989 MB]  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPGF087 TPS Booster Tune Measurement System 274
 
  • P.C. Chiu, Y.-S. Cheng, K.T. Hsu, K.H. Hu, C.Y. Liao
    NSRRC, Hsinchu, Taiwan
 
  The TPS is a state-of-the-art synchrotron radiation facility featuring ultra-high photon brightness with extremely low emittance. Its Booster has 6 FODO cells which include 7 BD dipoles with 1.6 m long and 2 BH dipoles with 0.8 m long in each cell. After magnetization of stainless steel vacuum chamber of the booster were identified and then dismantled, annealed, and re-installed, the electron beam energy of the Taiwan Photon Source (TPS) in the booster ring has ramped to 3 GeV in a week. The booster tune correction during ramping is one of the main reasons why the booster commissioning progress is so fast. In this paper the summarized the booster tune monitor system will be summarised  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPGF088 Integrating the Measuring System of Vibration and Beam Position Monitor to Study the Beam Stability 277
 
  • C. H. Huang, Y.-S. Cheng, P.C. Chiu, K.T. Hsu, K.H. Hu, C.Y. Liao
    NSRRC, Hsinchu, Taiwan
 
  For a low emittance light source, beam orbit motion needs to be controlled within submicron for obtaining a high quality light. Magnets vibration especially quadruples will be one of the main sources to destroy the beam stability. In order to study the relationship between vibration and beam motion, it is highly desirable to use a synchronous data acquisition system which integrates measurement of vibration and beam position monitor systems especially for the coherence analysis. For a larger vibration such as earthquakes are also deleterious to beam stability or even make the beam trip due to the quench of superconducting RF cavity. A data acquisition system integrated with an earthquake detector is also quite necessary to show and archive the data on the control system. The data acquisition systems of vibration and earthquake measurement system are summarized in this report. The relationship between the beam motion and magnets vibration will also study here.  
poster icon Poster MOPGF088 [0.504 MB]  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPGF019 Database Applications Development of the TPS Control System 732
 
  • Y.-S. Cheng, Y.-T. Chang, J. Chen, P.C. Chiu, K.T. Hsu, C. H. Huang, C.Y. Liao
    NSRRC, Hsinchu, Taiwan
 
  The control system had been established for the new 3 GeV synchrotron light source (Taiwan Photon Source, TPS) which was successful to commission at December 2014. Various control system platforms with the EPICS framework had been implemented and commissioned. The relational database (RDB) has been set up for some of the TPS control system applications used. The EPICS data archive systems are necessary to be built to record various machine parameters and status information into the RDB for long time logging. The specific applications have been developed to analyze the archived data which retrieved from the RDB. One EPICS alarm system is necessary to be set up to monitor sub-system status and record detail information into the RDB if the problem happened. Some Web-based applications with RDB have been gradually created to show the TPS machine status related information. The efforts are described at this paper.  
poster icon Poster WEPGF019 [4.008 MB]  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
FRB3O01 Commissioning of the TPS Control System 1173
 
  • C.Y. Liao, Y.-T. Chang, J. Chen, Y.-S. Cheng, P.C. Chiu, K.T. Hsu, S.Y. Hsu, K.H. Hu, C. H. Huang, C.H. Kuo, D. Lee, C.-J. Wang, C.Y. Wu
    NSRRC, Hsinchu, Taiwan
 
  Control system for the Taiwan Photon Source (TPS) has been completed in 2014. Commissioning of the accelerator system is in proceeding. Electron beam were stored at the storage ring and emit first light in December 31, 2014. TPS control system adopts EPICS toolkits as its frameworks. The subsystems control interfaces include event based timing system, Ethernet based power supply control, corrector power supply control, PLC-based pulse magnet power supply control and machine protection system, insertion devices motion control system, various diagnostics related control environment, and etc. The standard hardware components had been installed and integrated, and the various IOCs (Input Output Controller) had been implemented as various subsystems control platforms. Low level and high level hardware and software are tested intensively in 2014 and final revise to prepare for routine operation is under way. Efforts will be summarized at this paper.  
slides icon Slides FRB3O01 [41.594 MB]  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)