Author: Ha, K.M.
Paper Title Page
MOB3O02
NSLS II Project, Development, and Commissioning Results  
 
  • L.R. Dalesio, G. Carcassi, M.A. Davidsaver, J.H. De Long, K.M. Ha, W.K. Lewis, N. Malitsky, K. Shroff, Y. Tian, L. Yang
    BNL, Upton, Long Island, New York, USA
  • G. Shen
    FRIB, East Lansing, Michigan, USA
 
  The NSLS II project started control system development in 2007 and completed commissioning in 2015. New hardware, tools, and applications were developed throughout the project to meet the project goals. Significant developments included the fast orbit feedback system, service based physics applications, relational database tools, and an integrated operator environment Control System Studio (CSS). This paper will discuss the results of the developments that were undertaken and their use for the accelerator and beam lines, commissioning results, and lessons learned along the way.  
slides icon Slides MOB3O02 [2.265 MB]  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)