Paper |
Title |
Page |
MOPGF030 |
Upgrade of the Control and Interlock Systems for the Magnet Power Supplies in T2K Primary Beamline |
160 |
|
- K. Nakayoshi, Y. Fujii, K. Sakashita
KEK, Ibaraki, Japan
|
|
|
T2K is a long-baseline neutrino oscillation experiment at J-PARC in Japan. High intensity neutrino/antineutrino beam is generated and propagates 295km to Super-Kamiokande. High intensity proton beam, 350 kW in May 2015, is extracted from Main Ring synchrotron, guided through a primary proton beamline to a graphite target using normal-conducting (NC) magnets and super-conducting combined-function magnets. In October 2014, we replaced all the power supplies (PSs) for NC magnets with newly developed PSs. We also developed new control system based on EPICS and PLCs, putting emphasis on the safe operation of power supplies, and integrated it into the existing interlock system. Consequently the latency time for the interlock system was improved. We report the actual implementation and operation results of these developments.
|
|
|
Poster MOPGF030 [2.620 MB]
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|