Author: Fong, K.
Paper Title Page
MOPGF160 ARIEL Control System at TRIUMF - Status Update 460
 
  • R.B. Nussbaumer, D. Dale, K. Ezawa, K. Fong, H. Hui, R. Iranmanesh, J. Kavarskas, D.B. Morris, J.J. Pon, S. Rapaz, J.E. Richards, M. Rowe, T.M. Tateyama, E. Tikhomolov, G. Waters, P.J. Yogendran
    TRIUMF, Canada's National Laboratory for Particle and Nuclear Physics, Vancouver, Canada
 
  The Ad­vanced Rare Iso­tope & Elec­tron Linac (ARIEL) fa­cil­ity at TRI­UMF has now reached com­ple­tion of the first phase of con­struc­tion; the Elec­tron Linac. A com­mis­sion­ing con­trol sys­tem has been built and used to com­mis­sion the elec­tron e-gun and two stages of SRF ac­cel­er­a­tion. Nu­mer­ous con­trols sub­sys­tems have been de­ployed in­clud­ing beam­lines, vac­uum sys­tems, beam­line di­ag­nos­tics, ma­chine pro­tect sys­tem in­ter­faces, LLRF, HPRF, and cryo­gen­ics. This paper de­scribes some of the chal­lenges and so­lu­tions that were en­coun­tered, and de­scribes the scope of the pro­ject to date. An eval­u­a­tion of some tech­niques that had been pro­posed and de­scribed at ICALEPCS 2013 are in­cluded.  
poster icon Poster MOPGF160 [1.394 MB]  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)