Author: Chareyre, V.
Paper Title Page
MOPGF135 Upgrade of the Trigger Synchronisation and Distribution System of the Beam Dumping System of the Large Hadron Collider 397
 
  • N. Magnin, A. Antoine, E. Carlier, V. Chareyre, S. Gabourin, A. Patsouli, N. Voumard
    CERN, Geneva, Switzerland
 
  Various upgrades were performed on the Large Hadron Collider (LHC) Beam Dumping System (LBDS) during Long Shutdown 1 (LS1) at CERN, in particular to the Trigger Synchronisation and Distribution System (TSDS): A redundant direct connection from the LHC Beam Interlock System to the re-trigger lines of the LBDS was implemented, a fully redundant powering architecture was set up, and new Trigger Synchronisation Unit cards were deployed over two separate crates instead of one. These hardware changes implied the adaptation of the State Control and Surveillance System and an improvement of the monitoring and diagnosis systems, like the various Internal Post Operation Check (IPOC) systems that ensure that, after every beam dump event, the LBDS worked as expected and is 'as good as new' for the next LHC beam. This paper summarises the changes performed on the TSDS during LS1, highlights the upgrade of the IPOC systems and presents the problems encountered during the commissioning of TSDS before the LHC Run II.  
poster icon Poster MOPGF135 [0.969 MB]  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)