Author: Bellorini, F.
Paper Title Page
MOPGF104 Consolidations on the Vacuum Controls of the CERN Accelerators, During the First Long Shutdown of the LHC 322
 
  • P. Gomes, F. Antoniotti, F. Aragon, F. Bellorini, S. Blanchard, J-P. Boivin, N. Chatzigeorgiou, F. Daligault, R. Ferreira, J. Fraga, J. Gama, A. Gutierrez, P. Krakówski, H.F. Pereira, G. Pigny, P.P. Prieto, B. Rio, H. Vestergard
    CERN, Geneva, Switzerland
  • L. Kopylov, S. Merker, M.S. Mikheev
    IHEP, Moscow Region, Russia
 
  For two years (Spring 2013 - Spring 2015), the LHC went through its first long shutdown (LS1). It was mainly motivated by the consolidation of magnet interconnects, to allow operation with 6.5 TeV proton beams. Moreover, around the accelerator complex, many other systems were repaired, consolidated or upgraded, and several new installations came to life. The standardization of vacuum controls has progressed in the injectors, with the renovation of most of their obsolete equipment. In the LHC, many new instruments were added, the signal transmission integrity was improved, and the exposure to radiation was reduced in critical places. Several developments were needed for new equipment types or new operational requirements.  
poster icon Poster MOPGF104 [16.021 MB]  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
FRB3O02 Status of the European Spallation Source Control System 1177
 
  • T. Korhonen, R. Andersson, F. Bellorini, S.L. Birch, D.P. Brodrick, H. Carling, J. Cereijo García, R.N. Fernandes, L. Fernandez, B. Gallese, S.R. Gysin, E. Laface, N. Levchenko, M. Mansouri Sharifabad, A. Monera Martinez, R. Mudingay, A. Nordt, D. Paulic, D.P. Piso, K. Rathsman, M. Reščič, G. Trahern, M. Zaera-Sanz
    ESS, Lund, Sweden
  • N. Claesson, U. Rojec, K. Strniša, A.A. Söderqvist
    Cosylab, Ljubljana, Slovenia
 
  The European Spallation Source (ESS) is a collaboration of 17 European countries to build the world's most powerful neutron source for research. ESS has entered the construction phase and the plan is to produce first neutrons by 2019 and to complete the construction by 2025. The Integrated Control System Division (ICS) is responsible to provide control systems for the whole facility. The unprecented beam power of 5 MW and the construction of the facility with many components contributed in-kind presents a number of challenges to the control system. Systems have to be specified so that the work can be effectively shared between the contributors and on-site staff. Control system components need to provide a level of performance that can support the operation of the facility, be standardized so that integration to the facility can be done during a short installation period and be maintainable by the in-house staff after the construction has finished. This paper will outline the plans and principles that will be used to construct the control systems. The selected technologies and standards will be presented, as well as the plans for integration.  
slides icon Slides FRB3O02 [1.184 MB]  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)