Paper | Title | Page |
---|---|---|
MOMIB03 | Control Systems Issues and Planning for eRHIC | 58 |
|
||
Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy. The next generation of high-energy nuclear physics experiments involve colliding high-energy electrons with ions, as well as colliding polarized electrons with polarized protons and polarized helions (Helium-3 nuclei). The eRHIC project proposes to add an electron accelerator to the RHIC complex, thus allowing all of these types of experiments to be done by combining existing capabilities with high energy and high intensity electrons. In this paper we describe the controls systems requirements for eRHIC, the technical challenges, and our vision of a control system ten years into the future. What we build over the next ten years will be what is used for the ten years following the start of operations. This presents opportunities to take advantage of changes in technologies but also many challenges in building reliable and stable controls and integrating those controls with existing RHIC systems. This also presents an opportunity to leverage on state of the art innovations and build collaborations both with industry and other institutions, allowing us to build the best and most cost effective set of systems that will allow eRHIC to achieve its goals. |
||
![]() |
Slides MOMIB03 [0.633 MB] | |
![]() |
Poster MOMIB03 [2.682 MB] | |
MOPPC076 | Quantitative Fault Tree Analysis of the Beam Permit System Elements of Relativistic Heavy Ion Collider (RHIC) at BNL | 269 |
|
||
Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy. The RHIC Beam Permit System (BPS) plays a key role in safeguarding against the anomalies developing in the collider during a run. The BPS collects RHIC subsystem statuses to allow the beam entry and its existence in the machine. The building blocks of BPS are Permit Module (PM) and Abort Kicker Module (AKM), which incorporate various electronic boards based on VME specification. This paper presents a quantitative Fault Tree Analysis (FTA) of the PM and AKM, yielding the hazard rates of three top failures that are potential enough to cause a significant downtime of the machine. The FTA helps tracing down the top failure of the module to a component level failure (such as an IC or resistor). The fault trees are constructed for all module variants and are probabilistically evaluated using an analytical solution approach. The component failure rates are calculated using manufacturer datasheets and MIL-HDBK-217F. The apportionment of failure modes for components is calculated using FMD-97. The aim of this work is to understand the importance of individual components of the RHIC BPS regarding its reliable operation, and evaluate their impact on the operation of BPS. |
||
![]() |
Poster MOPPC076 [0.626 MB] | |
TUCOCA03 | Machine Protection Issues for eRHIC | 914 |
|
||
Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy. The eRHIC electron beams will be damaging both directly and as a result of synchrotron radiation. The machine protection and abort systems will be designed to prevent any equipment damage from the electron beams. In this paper we will review the requirements for the machine protection systems and the plans we have put into place to better evaluate the failure probabilities, beam abort systems designs, and overall machine protection systems designs. The machine protection systems will include a beam permit system that has inputs from loss monitors, power supplies, superconducting RF monitors, vacuum chamber heating monitors, water temperature, quench detectors, access controls systems, vacuum monitors, and longer term beam lifetime or slow loss monitors. There are three systems associated with the machine protection and beam abort systems; the beam permit link, the abort kicker systems, and the beam dumps. We describe the requirements for these systems and present our current plans for how to meet the requirements. |
||
![]() |
Slides TUCOCA03 [2.012 MB] | |
THPPC113 | Integrated Timing System for the EBIS Pre-Injector | 1325 |
|
||
Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy. The Electron Beam Ion Source (EBIS) began operating as a pre-injector in the C-AD RHIC accelerator complex in 2010. Historically, C-AD RHIC pre-injectors, like the 200MeV Linac, have had largely independent timing systems that receive a minimal number of triggers from the central C-AD timing system to synchronize the injection process. The EBIS timing system is much more closely integrated into central C-AD timing, with all EBIS machine cycles included in the master supercycle that coordinates the interoperation of C-AD accelerators. The integrated timing approach allows better coordination of pre-injector activities with other activities in the C-AD complex. Independent pre-injector operation, however, must also be supported by the EBIS timing system. This paper describes the design of the EBIS timing system and evaluates experience in operational management of EBIS timing. |
||
![]() |
Poster THPPC113 [21.388 MB] | |
THCOBB03 | Automating Control of the Beams for the NASA Space Radiation Laboratory | 1392 |
|
||
Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy. The NASA Space Radiation Laboratory (NSRL) at BNL uses many different beams to do experiments associated with evaluating the possible risks to astronauts in space environments. This facility became operational in 2003 and operates from the AGS Booster synchrotron. In order to simulate the space radiation environment some of these experiments need to make use of beams of various energies. To simulate solar flare events, we implemented the Solar Particle Simulator in 2005. This system put in modifications to the accelerator controls to allow beam energies to be changed automatically, enabling target samples to be irradiated with many energies of the same type of ion, without having to make use of degraders. To simulate Galactic Cosmic events, they need to also be able to automatically change the ions used to irradiate a single sample. This project aims to allow NSRL to change ions as well as beam energies within a very short period of time. To do this requires modifications to existing controls as well as building new controls for a laser ion source. In this paper we describe NSRL, our plans to implement the Galactic Cosmic Event Simulator, and the status of the laser ion source. |
||
![]() |
Slides THCOBB03 [4.853 MB] | |