MOPPC094 ARIEL Control System at TRIUMF – Project Update 318
 
  • R.B. Nussbaumer, D. Dale, D.B. Morris, K. Negishi, J.J. Pon, J.E. Richards, G. Waters, P.J. Yogendran
    TRIUMF, Canada's National Laboratory for Particle and Nuclear Physics, Vancouver, Canada
 
  The Advanced Rare Isotope & Electron Linac (ARIEL) facility at TRIUMF, scheduled for Phase 1 completion in 2014, will use a control system based on EPICS. Discrete subsystems within the accelerator, beamlines and conventional facilities have been clearly identified. Control system strategies for each identified subsystem have been developed, and components have been chosen to satisfy the unique requirements of each system. The ARIEL control system will encompass methodology already established in the TRIUMF ISAC & ISAC-II facilities in addition to adoption of a number of technologies previously unused at TRIUMF. The scope includes interface with other discrete subsystems such as cryogenics and power distribution, as well as complete subsystem controls packages.