Author: Merker, S.
Paper Title Page
MOPPC026 Bake-out Mobile Controls for Large Vacuum Systems 119
 
  • S. Blanchard, F. Bellorini, P. Gomes, H.F. Pereira
    CERN, Geneva, Switzerland
  • L. Kopylov, S. Merker, M.S. Mikheev
    IHEP, Moscow Region, Russia
 
  Large vacuum systems at CERN (Large Hadron Collider, the Low Energy Ion Rings…) require bake-out to achieve ultra-high vacuum specifications. The bake-out cycle is used to decrease the outgassing rate of the vacuum vessel and to activate the Non-Evaporable Getter (NEG) thin film. Bake-out control is a Proportional-Integral-Derivative (PID) regulation with complex recipes, interlocks and troubleshooting management and remote control. It is based on mobile Programmable Logic Controller (PLC) cabinets, fieldbus network and Supervisory Control and Data Acquisition (SCADA) application. CERN vacuum installations include more than 7 km of baked vessels; using mobile cabinets reduces considerably the cost of the control system. The cabinets are installed close to the vacuum vessels during the time of the bake-out cycle. Mobile cabinets can be used in all the CERN vacuum facilities. Remote control is provided by fieldbus network and SCADA application.  
poster icon Poster MOPPC026 [3.088 MB]  
 
MOPPC027 The Control System of CERN Accelerators Vacuum [LS1 Activities and New Developments] 123
 
  • P. Gomes, F. Antoniotti, F. Bellorini, S. Blanchard, J-P. Boivin, J. Gama, G. Girardot, G. Pigny, B. Rio, H. Vestergard
    CERN, Geneva, Switzerland
  • L. Kopylov, S. Merker, M.S. Mikheev
    IHEP, Moscow Region, Russia
 
  After 3 years of operation, the LHC entered its first Long Shutdown period (LS1), in February 2013. Major consolidation and maintenance works will be performed across the whole CERN’s accelerator chain, in order to prepare the LHC to restart at higher energy, in 2015. The rest of the accelerator complex shall resume in mid-2014. We report on the recent and on-going vacuum-controls projects. Some of them are associated with the consolidations of the vacuum systems of LHC and of its injectors; others concern the complete renovation of the controls of some machines; and there are also some completely new installations. Due to the wide age-span of the existing vacuum installations, there is a mix of design philosophies and of control-equipment generations. The renovation and the novel projects offer an opportunity to improve the Quality Assurance of vacuum controls by: identifying, documenting, naming and labelling all pieces of equipment; minimising the number of equipment versions with similar functionality; homogenising the control architectures, while converging to a single software framework.  
poster icon Poster MOPPC027 [67.309 MB]  
 
MOPPC030 Developments on the SCADA of CERN Accelerators Vacuum 135
 
  • F. Antoniotti, S. Blanchard, M. Boccioli, P. Gomes, H.F. Pereira
    CERN, Geneva, Switzerland
  • L. Kopylov, S. Merker, M.S. Mikheev
    IHEP, Moscow Region, Russia
 
  During the first 3 years of LHC operation, the priorities for the vacuum controls SCADA were to attend to user requests, and to improve its ergonomics and efficiency. We now have reached: information access simplified and more uniform; automatic scripts instead of fastidious manual actions; functionalities and menus standardized across all accelerators; enhanced tools for data analysis and maintenance interventions. Several decades of cumulative developments, based on heterogeneous technologies and architectures, have been asking for a homogenization effort. The Long Shutdown (LS1) provides the opportunity to further standardize our vacuum controls systems, around Siemens-S7 PLCs and PVSS SCADA. Meanwhile, we have been promoting exchanges with other Groups at CERN and outside Institutes: to follow the global update policy for software libraries; to discuss philosophies and development details; and to accomplish common products. Furthermore, while preserving the current functionalities, we are working on a convergence towards the CERN UNICOS framework.  
poster icon Poster MOPPC030 [31.143 MB]