|
- M. Iwasaki, A. Akiyama, K. Furukawa, H. Kaji, T. Naito, T.T. Nakamura, J.-I. Odagiri, S. Sasaki
KEK, Ibaraki, Japan
- T. Aoyama, M. Fujita, T. Nakamura, N. Tanaka, K. Yoshii
Mitsubishi Electric System & Service Co., Ltd, Tsukuba, Japan
- M. Hirose, K. Iwase
KIS, Ibaraki, Japan
- T. Okazaki, N. Yoshifuji
EJIT, Hitachi, Ibaraki, Japan
|
|
|
SuperKEKB is the upgrade of the KEKB asymmetric energy e+e− collider, for the B-factory experiment in Japan, designed to achieve a 40-times higher luminosity than the world record by KEKB. The KEKB control system was based on EPICS at the equipment layer and scripting languages at the operation layer. The SuperKEKB control system continues to employ those features, while we implement additional technologies for the successful operation at such a high luminosity. In the accelerator control network system, we introduce 10GbE for the wider bandwidth data transfer, and redundant configurations for reliability. The network security is also enhanced. For the SuperKEKB construction, the wireless network is installed into the beamline tunnel. In the timing system, the new configuration for positron beams is required. We have developed the faster response beam abort system, interface modules to control thousands magnet power supplies, and the monitoring system for the final focusing superconducting magnets to assure stable operations. We introduce the EPICS embedded PLC, where EPICS runs on a CPU module. The design and status of the SuperKEKB accelerator control system will be presented.
|
|