THCOCA05 Laser MegaJoule Timing System 1457
 
  • J.I. Nicoloso
    CEA/DAM/DIF, Arpajon, France
  • J.P.A. Arnoul, J.J. Dupas, P. Raybaut
    CEA, Arpajon, France
 
  The French Commissariat à l’Énergie Atomique et aux Énergies alternatives (CEA) is currently building the Laser Megajoule (LMJ). This facility is designed to deliver laser energy to targets for high energy density physics experiments, including fusion experiments. The Integrated Timing and Triggering System (ITTS) is one of the critical LMJ components, in charge of timing distribution for synchronizing the laser beams and triggering the shot data acquisitions. The LMJ ITTS Control System provides a single generic interface to its users at the Supervisory level, built around the key concept of “Synchronized Channels Group”, a set of delay channels triggered simultaneously. Software common components provide basic mechanisms: communication with its users, channel registration… User-defined delays are specified with respect to a given reference(target chamber center, quadruplet or beam reference times), these delays are then translated into hardware delays according to different parameters such as electronic cards temperatures(for thermal drift correction) and transit delays. Equipments are mainly off-the-shelf timing equipments delivering trigger signals with jitter down to 15ps rms.  
slides icon Slides THCOCA05 [0.974 MB]