Author: Al-Mohammad, H.
Paper Title Page
MOPB022 Diagnostics During SESAME Booster Commissioning 85
 
  • H. Al-Mohammad, K. Manukyan
    SESAME, Allan, Jordan
 
  SESAME* is a 2.5 GeV synchrotron radiation facility under construction at Allan (Jordan), consisting of a 20 MeV Microtron as pre-injector and an 800 MeV Booster Synchrotron. The pre-injector and booster are originally BESSY-I machine with some major changes within power supplies and diagnostics tools. The diagnostic tools are: Fluorescent Screens, BPMs, DCCT, FCT and Synchrotron Radiation Monitor. The Booster had been commissioned in 2014. The installed tools allowed to determine current, orbit, tune, chromaticity and emittance. Set up of the diagnostics and results are presented in this paper.
SYNCHROTRON-LIGHT FOR EXPERIMENTAL SCIENCE AND APPLICATIONS IN THE MIDDLE EAST
 
poster icon Poster MOPB022 [2.947 MB]  
Export • reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml)